OpenLegislation

Article 33 Certification of documents and plansI1

England, Wales and Scotland

(1)

The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State printed copies of—

(a)

the works plans (version AD02.01 (revision 2));

(b)

the land plans (version AD02.01 (revision 2));

(c)

the book of reference (version AD04.03 (revision 2));

(d)

the environmental statement (version AD06.02, including volume 3 appendices (revision 1));

(e)

the environmental commitments and mitigation schedule (AD06.03 (revision 2));

(f)

the code of construction practice (AD05.12 (revision 2));

(g)

the design code principles (AD02.02 (revision 1)); and

(h)

the DCO Schedule 6-8 explanatory diagrams (AD03.05 (revision 1)),

for certification that they are true copies of the documents referred to in this Order.

(2)

A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

F1(3)

The undertaker may submit to the Secretary of State a written memorandum explaining any differences between references to the works comprising the Authorised Development used in this Order and those used in the plans and documents submitted for certification in accordance with article 33(1). The Secretary of State may certify such memorandum as being a true and accurate explanation of any differences and any document certified in accordance with article 33(1) shall be interpreted in accordance with the certified memorandum.

Annotations

Textual amendments

F1

Art. 33(3) inserted (6.7.2018) by The North London Heat and Power Generating Station (Correction) Order 2018 (S.I. 2018/822), art. 1, Sch.

Commencement

I1

Art. 33 in force at 18.3.2017, see art. 1