Paragraph 6 Surveying of WaterwayI1

England, Wales and Scotland

(1)

Both before commencing any specified works upon CRT’s Property or the Waterway, and following practical completion of those specified works, the undertaker must procure, at a reasonable and necessary expense to the undertaker, the carrying out of a survey (including a dip-survey to measure the depth of the Waterway), by an appropriately qualified structural engineer (the “structural surveyor”), approved by CRT (whose approval is not to be unreasonably withheld or delayed), of so much of the Waterway as may be affected by the specified works (“the survey”).

(2)

For the purposes of the survey the undertaker and CRT must—

(a)

afford reasonable facilities to the structural surveyor for access to the site of the specified works and to any land and existing works of the undertaker which may provide support for the Waterway and to CRT’s Property as will or may be affected by the specified works; and

(b)

supply the structural surveyor as soon as reasonably practicable with all such information as the structural surveyor may reasonably require with regard to such existing works of the undertaker, to the specified works and the proposed method of their construction, and with regard to the Waterway.

(3)

The reasonable and necessary costs of the survey include the costs of any dewatering or reduction of the water level of any part of the Waterway (where reasonably required) which may be effected to facilitate the carrying out of the survey and the provisions of this Part apply with all necessary modifications to any such dewatering or reduction in the water level as though the same were specified works.

(4)

One electronic copy and one hard copy of the survey must be provided to CRT at no cost to CRT.

Annotations

Commencement

I1

Sch. 13 Pt. 3 para. 6 in force at 18.3.2017, see art. 1