Part 2 CLEARWAYSI1
England, Wales and Scotland
(1) Location | (2) Description | (3) Event |
|---|---|---|
| A508 Southbound | From the junction with the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 junction 15 to the roundabout junction between the A508 and the main site access road, the centreline of which is shown coloured purple between points 1 and 2 on the traffic regulation plan (Document 2.6A). | Completion of Works No. 7 |
| A508 Northbound | From the roundabout junction between the A508 and the rail terminal access road to the junction with the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at the M1 junction 15; the centreline of which is shown coloured purple between points 3 and 4 as shown on the traffic regulation plan (Document 2.6A). | Completion of Works No. 7 |