The Nottingham City Council (River Trent Cycle and Pedestrian Bridge) Scheme 2024 Confirmation Instrument 2024
S.I. 2024/1197 · Made 20 November 2024
Highways, England
Made 20th November 2024
Coming into force in accordance with article 1
In accordance with section 107(1) and (2) of that Act, the Secretary of State has taken into consideration the reasonable requirements of navigation over the waters affected and includes such plans and specifications as necessary.
Annotations to the whole text
Footnotes
- f1
-
1980 c. 66. Section 106(3) is amended by the Infrastructure Act 2015 (c. 7), section 1(6), paragraphs 1 and 34(1) and (2) of Schedule 1(1). Part,
- f2
Contents
- 1Section 1
- 2Section 2
- 3Section 3
- Signature
- Schedule THETHE NOTTINGHAM CITY COUNCIL (RIVER TRENT CYCLE AND PEDESTRIAN BRIDGE) SCHEME 2024
- Schedule THE SCHEDULE TO THE SCHEMEPlans and specification of the Bridge
- Explanatory note
1
This Instrument may be cited as the Nottingham City Council (River Trent Cycle and Pedestrian Bridge) Scheme 2024 Confirmation Instrument 2024 and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.
2
The Nottingham City Council (River Trent Cycle and Pedestrian Bridge) Scheme 2024 (“the Scheme”) is hereby confirmed.
3
The Scheme as confirmed including its Schedules and plans are set out in the Schedules to this Instrument and copies of the Scheme with its accompanying plans are deposited at the offices of the Department for Transport, Deposited Documents Service, MHCLG, 1 Priory Square, Priory Street, Hastings, East Sussex, TN34 1EA and at the offices of Nottingham City Council, Loxley House, Station Street Nottingham NG2 3NG.
Signature
Signed by Authority of the Secretary of State
Martin Gilmour
A Senior Civil Servant in the Department for Transport
20th November 2024
Schedule THETHE NOTTINGHAM CITY COUNCIL (RIVER TRENT CYCLE AND PEDESTRIAN BRIDGE) SCHEME 2024
The Nottingham City Council (“the Council”) makes this Scheme in exercise of its powers under section 106(3) of the Highways Act 1980 and of all other powers enabling them in that behalf.
The Council are authorised to construct over the navigable wates of the River Trent the cycle and pedestrian bridge (“the Bridge”) specified in the Schedule to this Scheme within the Councils administrative area (on the north bank of the River Trent) and within the administrative area of Nottinghamshire County Council (on the south bank of the River Trent).
By way of an Agreement dated 26th June 2024 made pursuant to Section 8 of the highways Act 1980 the Council is authorised to exercise the specified functions on behalf of Nottinghamshire County Council for this Scheme and other related matters.
The Scheme may be cited as “The Nottingham City Council (River Trent Cycle and Pedestrian Bridge) Scheme 2024”.
| GIVEN UNDER THE COMMON SEAL | |
| OF NOTTINGHAM CITY COUNCIL | |
| was hereunto affixed | CS |
| This 9th day of July 2024 | SEAL ORDER BOOK No 83537 |
| Authorised Signatory | |
| Authorised by the Corporate Director for Growth and City Development under Scheme of Delegation Reference 5020 |
Schedule THE SCHEDULE TO THE SCHEMEPlans and specification of the Bridge
The location of the Bridge is shown on the Plan at Appendix A (drawing No. RTF-RAM-GEN-WB01-DR-CB-00006 Rev P03) and the general arrangement and design is shown on the plan at Appendix B (Drawing No. RTF-RAM-GEN-WB01-DR-CB-00002 Rev P04) which are attached to this Scheme and titled “The Nottingham City Council (River Trent Cycle and Pedestrian Bridge) Scheme 2024”.
Explanatory note
(This note is not part of the Instrument)
This Instrument confirms a Scheme to construct a cycle and pedestrian bridge over the navigable waters of the River Trent within the Councils administrative area (on the north bank of the River Trent) and within the administrative area of Nottinghamshire County Council (on the south bank of the River Trent).