Part 2 Continued application of the 2005 regime in relation to external waters during the transitional period
- 2General saving of the 2005 regime
- 3Continued application of the 2005 regime to existing and proposed non-production installations
- 4Continued application of the 2005 regime to existing and proposed production installations
- 5Continued application of the 2005 regime to well operations
- 6Design notification for production installations to be established during transitional period
- 7Design notification: election to prepare notification under these Regulations
- 8Election to prepare a safety case under these Regulations
- 9Treatment of current safety cases for installations continuing under the 2005 regime
- 10Paragraph 10
- 11Paragraph 11