Part 2 CONTINUED APPLICATION OF THE 2007 REGIME IN RELATION TO EXTERNAL WATERS DURING THE TRANSITIONAL PERIOD
Northern Ireland
- 2General saving of the 2007 regime
- 3Continued application of the 2007 regime to existing and proposed non-production installations
- 4Continued application of the 2007 regime to existing and proposed production installations
- 5Continued application of the 2007 regime to well operations
- 6Design notification for production installations to be established during transitional period
- 7Design notification: election to prepare notification under these Regulations
- 8Election to prepare a safety case under these Regulations
- 9Treatment of current safety cases for installations continuing under the 2007 regime
- 10Treatment of current safety cases for installations continuing under the 2007 regime
- 11Treatment of current safety cases for installations continuing under the 2007 regime