Paragraph 10
United Kingdom
Where a production installation is to be moved to a new location F1within internal waters, an explanation of why the operator considers the installation suitable for the new location.
Annotations
Textual amendments
- F1
Words in Sch. 1 para. 10 inserted (19.7.2015) by The Offshore Installations (Offshore Safety Directive) (Safety Case etc.) Regulations 2015 (S.I. 2015/398), reg. 1, Sch. 13 para. 40 (with reg. 4(2), Sch. 14)