OpenLegislation

Paragraph 10 I1

Northern Ireland

Where a well operation is to be carried out by means of a non-production installation or a vessel—

(a)

particulars of—

(i)

the meteorological and oceanographic conditions to which that installation or, as the case may be, vessel may foreseeably be subjected;

(ii)

the depth of water; and

(iii)

the properties of the F1bed of internal waters and subsoil,

at the location at which the well operation will be carried out; and

(b)

a description of how the well operator and—

(i)

the owner of the installation; or

(ii)

the operator and owner of the vessel,

involved in the well operation will co-ordinate their management systems so as to reduce the risks from a major accident to comply with the relevant statutory provisions.

Annotations

Textual amendments

F1

Words in Regulation substituted (19.12.2016) by The Offshore Installations (Offshore Safety Directive) (Safety Case etc.) Regulations (Northern Ireland) 2016 (S.R. 2016/406), reg. 1, Sch. 14 para. 36(3) (with regs. 4(2), 36(4), Sch. 16)

Commencement

I1

Sch. 7 para. 10 in operation at 21.5.2007, see reg. 1