Part 1 Installations stationed at time the Order is madeI1
United Kingdom
(1) Name or other designation of the offshore installation | (2) Latitude | (3) Longitude |
|---|---|---|
Arthur Production Well 1 and Subsea Manifold Block 53/02, Thames and Welland Field | 52°54.726’ North | 02°14.847’ East |
Carrack East Drill Site Block 49/15a, Carrack Field | 53°34.53’ North | 02°52.86’ East |
Carrack West Drill Site Block 49/14b, Carrack Field | 53°35.84’ North | 02°41.85’ East |
| F1. . . | ||
Production Well P1 Block 211/23d, Causeway Field | 61°16.49’ North | 01°25.83’ East |
Production Well P2 Block 211/22a, Fionn Field | 61°14.44’ North | 01°22.06’ East |
Schiehallion Block 204/20, Schiehallion/Loyal Field | 60°21.38’ North | 04°04.07’ West |
Water Injection Well WI Block 211/23d, Causeway Field | 61°15.75’ North | 01°25.54’ East |
Annotations
Textual amendments
- F1
Words in Sch. Pt. 1 omitted (8.8.2023) by virtue of The Offshore Installations (Safety Zones) Order 2023 (S.I. 2023/838), arts. 1(2), 4(2)
Commencement
- I1
Sch. Pt. 1 in force at 6.8.2013 in accordance with art. 1(2)