Part 2 Installations not stationed at time the Order is madeI1
United Kingdom
(1) Name or other designation of the offshore installation | (2) Latitude | (3) Longitude |
|---|---|---|
Galia Production Drill Centre Block 30/24b, Galia Field | 56°11.147’ North | 02°41.325’ East |
Juliet Subsea Manifold Block 47/14b, Juliet Field | 53°33.19’ North | 00°45.25’ East |
Kew Wellhead Block 49/04c, Chiswick Field | 53°57.30’ North | 02°47.07’ East |
Solan Production Well P1 Block 205/26a, Solan Field | 60°03.84’ North | 03°58.53’ West |
Solan Production Well P2 Block 205/26a, Solan Field | 60°03.76’ North | 03°58.68’ West |
Annotations
Commencement
- I1
Sch. Pt. 2 in force at 6.8.2013 in accordance with art. 1(2)