Regulation 12 Geotechnical information in a storage permit application
The OGA or a subsequent holder may publish geotechnical information in a storage permit application after the earlier of—
the period of five years beginning with the date on which injection at the relevant storage site commences, and
the date on which a determination event occurs in respect of the relevant CS licence.
In paragraph (1)—
-
“geotechnical information in a storage permit application” means information which—
- (a)
has been included in an application for a storage permit under regulation 6 of the 2010 Licensing Regulations,
- (b)
relates to—
- (i)
the geotechnical engineering or analysis required to carry out the activities described in the application, or
- (ii)
the geology of the area to which the application relates, and
- (i)
- (c)
is not information to which regulation 5 applies;
- (a)
-
“relevant storage site” means, in relation to geotechnical information which has been included in an application for a storage permit under regulation 6 of the 2010 Licensing Regulations, the storage site in respect of which the application was made.