(1)

No stage of Work No. 16 may commence until for that stage details of—

(a)

the layout, scale, building elevations and external appearance of the onshore HVAC substation;

(b)

proposed finished ground levels;

(c)

operational lighting;

(d)

hard surfacing materials; and

(e)

vehicular and pedestrian access, parking and circulation areas,

have been submitted to and approved by the Lincolnshire County Council in consultation with the relevant planning authority and, in respect of details submitted in accordance with (b), the Environment Agency.

(2)

Work No. 16 must be carried out in accordance with the approved details.

(3)

The details submitted under sub-paragraph (1) must be in accordance with the design principles statement and the design approach document.

(4)

The cable ducts and cables comprised within Work No. 11 and Work No. 12 must be installed using a trenchless technique.

(5)

The cable ducts and cables to be installed in plot 17-001 (as shown on the land plans) must be installed using a trenchless technique.

(6)

The cable ducts and cables to be installed in plots 06-001, 06-002, 06-005, 06-007 and 06-008 (as shown on the land plans) must be installed using a trenchless technique.