The Outer Dowsing Offshore Wind Farm Order 2026
S.I. 2026/138 · Made 10 February 2026
Infrastructure Planning
Made 10th February 2026
Coming into force 4th March 2026
An application under section 37 of the Planning Act 2008 (“the 2008 Act”)f1 has been made to the Secretary of State for an order granting development consent.
The application was examined by the Examining Authority, which has made a report to the Secretary of State under section 74(2)f2 of the 2008 Act.
The Examining Authority, having considered the application together with the documents that accompanied it, and the representations made and not withdrawn, has, in accordance with section 74 of the 2008 Act made a report and recommendation to the Secretary of State.
The Secretary of State has considered the report and recommendation of the Examining Authority, has taken into account the environmental information in accordance with regulation 4 of the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017f3 and has had regard to the documents and matters referred to in section 104(2)f4 of the 2008 Act.
The Secretary of State is satisfied that special category land comprised within the Order land, when burdened with the new rights authorised for compulsory acquisition under the terms of this Order, will be no less advantageous than it was before to the persons in whom it is vested; other persons, if any, entitled to rights of common or other rights; and the public; and that, accordingly, section 132(3) of the 2008 Act applies.
The Secretary of State, having decided the application, has determined to make an order giving effect to the proposals comprised in the application on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application.
The Secretary of State, in exercise of the powers conferred by sections 114f5 and 120f6 of the 2008 Act, makes the following Order.
Annotations to the whole text
Footnotes
- f1
-
2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of, and schedule 13 to, the Localism Act 2011 (c. 20) and by sections 22 to 27 of the Growth and Infrastructure Act 2013 (c. 27).
- f2
-
Section 74 was amended by sections 128(2) and 237 and paragraph 29 of Schedule 13 and paragraph 1 of Schedule 25 to the Localism Act 2011.
- f3
- f4
-
Section 104(2) was amended by paragraph 49(3) of Schedule 13 to the Localism Act 2011 (c. 20) and section 58(5) of the Marine and Coastal Access Act 2009 (c. 23).
- f5
-
Section 114 was amended by paragraph 55 of Schedule 13 to the Localism Act 2011 (c. 20).
- f6
-
Section 120 was amended by section 140 and paragraph 60 of Schedule 13 to the Localism Act 2011 (c. 20).
Contents
- Part 1: Preliminary
- 1Citation and commencement
- 2Interpretation
- Part 2: Principal Powers
- 3Development consent etc. granted by the Order
- 4Power to maintain the authorised project
- 5Benefit of the Order
- 6Application and modification of legislative provisions
- 7Defence to proceedings in respect of statutory nuisance
- Part 3: Streets
- 8Street works
- 9Application of the 1991 Act
- 10Temporary closure of public rights of way
- 11Temporary closure of streets
- 12Access to works
- 13Agreements with street authorities
- 14Power to alter layout etc. of streets
- 15Traffic Regulation
- Part 4: Supplemental powers
- 16Discharge of water
- 17Authority to survey and investigate the land onshore
- Part 5: Powers of Acquisition
- 18Compulsory acquisition of land
- 19Time limit for exercise of authority to acquire land compulsorily
- 20Compulsory acquisition of rights
- 21Private rights
- 22Application of the Compulsory Purchase (Vesting Declarations) Act 1981
- 23Modification of Part 1 of the Compulsory Purchase Act 1965
- 24Acquisition of subsoil or airspace only
- 25Rights under or over streets
- 26Temporary use of land for carrying out the authorised project
- 27Temporary use of land for maintaining authorised project
- 28Statutory undertakers
- 29Recovery of costs of new connections
- Part 6: Operations
- 30Operation of generating station
- 31Deemed marine licences under the 2009 Act
- Part 7: Miscellaneous and general
- 32Application of landlord and tenant law
- 33Amendment of local legislation
- 34Operational land for purposes of the 1990 Act
- 35Felling or lopping of trees and removal of hedgerows
- 36Trees subject to tree preservation orders
- 37Protective provisions
- 38Arbitration
- 39Requirements, appeals, etc.
- 40Certification of plans etc.
- 41Abatement of works abandoned or decayed
- 42Saving provisions for Trinity House
- 43Crown rights
- 44Funding
- 45Compensation provisions
- 46Service of notices
- 47Transfer of functions of the relevant local planning authority
- 48No double recovery
- Signature
- Schedule 1: Authorised project
- Part 1: Authorised development
- 1Paragraph 1
- 2Paragraph 2
- Part 2: Ancillary Works
- 3Paragraph 3
- Part 3: Requirements
- 4Time limits
- 5Detailed offshore design parameters
- 6Detailed offshore design parameters
- 7Detailed offshore design parameters
- 8Detailed offshore design parameters
- 9Detailed offshore design parameters
- 10Offshore decommissioning
- 11Stages of authorised project onshore
- 12Detailed onshore design parameters
- 13Provision of landscaping
- 14Implementation and maintenance of landscaping
- 15Ecological management plan
- 16Fencing and other means of permanent enclosure
- 17Temporary fencing and other temporary means of enclosure
- 18Operational drainage management and emergency flood response
- 19Contaminated land and groundwater
- 20Onshore archaeology
- 21Code of construction practice
- 22Construction hours
- 23Highway accesses
- 24Traffic
- 25Public rights of way
- 26Restoration of land used temporarily for construction
- 27Onshore decommissioning
- 28Control of noise during operational phase
- 29Control of artificial light emissions during operational phase
- 30Aviation Lighting
- 31Requirement for written approval
- 32Amendments to approved details
- 33Skills, supply chain and employment
- 34Cromer and Claxby Radar Mitigation
- 35Ministry of Defence Surveillance Operation
- 36Biodiversity Net Gain
- 37Wake Effects
- Schedule 2Streets subject to street works
- Schedule 3Public rights of way to be temporarily closed
- Schedule 4Streets to be temporarily closed
- Schedule 5Access to works
- Schedule 6: Traffic regulation
- 1Part 1
- 2Part 2
- Schedule 7Land in which only new rights etc. may be acquired
- Schedule 8: Modification of compensation and compulsory purchase enactments for creation of new rights and imposition of new restrictions
- 1Compensation enactments
- 2Compensation enactments
- 3Compensation enactments
- 4Application of the 1965 Act
- 5Application of the 1965 Act
- 6Application of the 1965 Act
- 7Application of the 1965 Act
- 8Application of the 1965 Act
- 9Application of the 1965 Act
- 10Application of the 1965 Act
- Schedule 9Land of which temporary possession may be taken
- Schedule 10: Deemed marine licence under the 2009 Act - generation assets
- Part 1: Licensed Marine Activities
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Part 2: Conditions
- 10Design parameters
- 11Design parameters
- 12Design parameters
- 13Maintenance of the authorised scheme
- 14Vessels under the undertaker’s control
- 15Extension of time periods
- 16Notification and Inspection
- 17Aids to navigation
- 18Colouring of structures
- 19Aviation safety
- 20Chemicals, drilling and debris
- 21Notification of unauthorised deposits
- 22Pre-construction plans and documentation
- 23Pre-construction plans and documentation
- 24Offshore safety management
- 25Reporting of engaged agents, contractors and vessels
- 26Pre-construction monitoring and surveys
- 27Construction monitoring
- 28Post construction
- 29Reporting of impact pile driving
- 30Deployment of cable protection
- 31Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
- 32Completion of construction
- 33Maintenance reporting
- 34Piling restriction for spawning herring
- Schedule 11: Deemed marine licence under the 2009 Act – offshore transmission assets
- Part 1: Licensed marine activities
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Part 2: Conditions
- 10Design parameters
- 11Design parameters
- 12Design parameters
- 13Maintenance of the authorised scheme
- 14Vessels under the undertaker’s control
- 15Extension of time periods
- 16Notification and Inspection
- 17Aids to navigation
- 18Colouring of structures
- 19Aviation safety
- 20Chemicals, drilling and debris
- 21Notification of unauthorised deposits
- 22Pre-construction plans and documentation
- 23Pre-construction plans and documentation
- 24Offshore safety management
- 25Reporting of engaged agents, contractors and vessels
- 26Pre-construction monitoring and surveys
- 27Construction monitoring
- 28Post construction
- 29Reporting of impact pile driving
- 30Deployment of cable protection
- 31Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
- 32Completion of construction
- 33Maintenance reporting
- 34Seasonal restriction
- Schedule 12: Deemed marine licence under the 2009 Act – northern artificial nesting structure 1
- Part 1: Licensed marine activities
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Part 2: Conditions
- 10Design parameters
- 11Maintenance of the authorised scheme
- 12Vessels under the undertaker’s control
- 13Extension of time periods
- 14Notification and Inspection
- 15Aids to navigation
- 16Colouring of structures
- 17Chemicals, drilling and debris
- 18Notification of unauthorised deposits
- 19Aviation safety
- 20Pre-construction plans and documents
- 21Pre-construction plans and documents
- 22Reporting of engaged agents, contractors and vessels
- 23Reporting of impact pile driving
- 24Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
- 25Maintenance reporting
- 26Piling restriction for spawning herring
- Schedule 13: Deemed marine licence under the 2009 Act – northern artificial nesting structure 2
- Part 1: Licensed marine activities
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Part 2: Conditions
- 10Design parameters
- 11Maintenance of the authorised scheme
- 12Vessels under the undertaker’s control
- 13Extension of time periods
- 14Notification and Inspection
- 15Aids to navigation
- 16Colouring of structures
- 17Chemicals, drilling and debris
- 18Notification of unauthorised deposits
- 19Aviation safety
- 20Pre-construction plans and documents
- 21Pre-construction plans and documents
- 22Reporting of engaged agents, contractors and vessels
- 23Reporting of impact pile driving
- 24Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
- 25Maintenance reporting
- 26Piling restriction for spawning herring
- Schedule 14: Deemed marine licence under the 2009 Act – southern artificial nesting structure 1
- Part 1: Licensed marine activities
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Part 2: Conditions
- 10Design parameters
- 11Maintenance of the authorised scheme
- 12Vessels under the undertaker’s control
- 13Extension of time periods
- 14Notification and Inspection
- 15Aids to navigation
- 16Colouring of structures
- 17Chemicals, drilling and debris
- 18Notification of unauthorised deposits
- 19Aviation safety
- 20Pre-construction plans and documents
- 21Pre-construction plans and documents
- 22Reporting of engaged agents, contractors and vessels
- 23Reporting of impact pile driving
- 24Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
- 25Maintenance reporting
- Schedule 15: Deemed marine licence under the 2009 Act – southern artificial nesting structure 2
- Part 1: Licensed marine activities
- 1Paragraph 1
- 2Paragraph 2
- 3Paragraph 3
- 4Paragraph 4
- 5Paragraph 5
- 6Paragraph 6
- 7Paragraph 7
- 8Paragraph 8
- 9Paragraph 9
- Part 2: Conditions
- 10Design parameters
- 11Maintenance of the authorised scheme
- 12Vessels under the undertaker’s control
- 13Extension of time periods
- 14Notification and Inspection
- 15Aids to navigation
- 16Colouring of structures
- 17Chemicals, drilling and debris
- 18Notification of unauthorised deposits
- 19Aviation safety
- 20Pre-construction plans and documents
- 21Pre-construction plans and documents
- 22Reporting of engaged agents, contractors and vessels
- 23Reporting of impact pile driving
- 24Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
- 25Maintenance reporting
- Schedule 16
- 1Paragraph 1
- Schedule 17: Hedgerows
- 1Removal of hedgerows
- 2Removal of important hedgerows
- Schedule 18: Protective Provisions
- Part 1: Protection for electricity, gas, water and sewerage undertakers
- 1Application
- 2Application
- 3Precedence of the 1991 Act in respect of apparatus in the street
- 4No acquisition etc. except by agreement
- 5Removal of apparatus
- 6Facilities and rights for alternative apparatus
- 7Retained apparatus
- 8Expenses and costs
- 9Expenses and costs
- 10Miscellaneous
- 11Miscellaneous
- Part 2: Protection for operators of electronic communications code networks
- 12Paragraph 12
- 13Paragraph 13
- 14Paragraph 14
- 15Paragraph 15
- 16Paragraph 16
- 17Paragraph 17
- Part 3: Protection for Anglian Water Services Limited
- 18Application
- 19Interpretation
- 20On street apparatus
- 21Apparatus in closed streets
- 22Acquisition of land
- 23Removal of apparatus
- 24Facilities and rights for alternative apparatus
- 25Retained apparatus
- 26Expenses and costs
- 27Expenses and costs
- 28Cooperation
- 29Cooperation
- 30Cooperation
- 31Cooperation
- 32Cooperation
- 33Cooperation
- Part 4: Protection for the Environment Agency
- 34Paragraph 34
- 35Submission and approval of plans
- 36Construction of protective works
- 37Timing of works and service of notices
- 38Works not in accordance with this Part of Schedule 18
- 39Maintenance of works
- 40Remediating impaired drainage work
- 41Agency access
- 42Free passage of fish
- 43Indemnity
- 44Indemnity
- 45Disputes
- Part 5: Protection for the drainage authorities
- 46Paragraph 46
- 47Paragraph 47
- 48Paragraph 48
- 49Paragraph 49
- 50Paragraph 50
- 51Paragraph 51
- 52Paragraph 52
- 53Paragraph 53
- 54Paragraph 54
- 55Paragraph 55
- 56Paragraph 56
- Part 6: Protection for the Harbour Authority
- 57Paragraph 57
- 58Interpretation
- 59Submission and approval of plans
- 60Construction of specified works and service of notices
- 61Construction of specified works and service of notices
- 62Harbour legislation
- 63Harbour legislation
- Part 7: Protection for National Grid Electricity Transmission Plc
- 64Application
- 65Interpretation
- 66Interaction with the Proposed NGET Projects
- 67On Street Apparatus
- 68Apparatus of National Grid Electricity Transmission Plc in closed streets
- 69Acquisition of land
- 70Removal of apparatus
- 71Facilities and rights for alternative apparatus
- 72Retained apparatus: protection
- 73Expenses
- 74Indemnity
- 75Enactments and agreements
- 76Co-operation
- 77Access
- 78Arbitration
- 79Notices
- 80Restriction on authorised development
- Part 8: Protection for National Gas Transmission Plc
- 81Application
- 82Interpretation
- 83On Street Apparatus
- 84Apparatus of National Gas in closed streets
- 85Acquisition of land
- 86Removal of apparatus
- 87Facilities and rights for alternative apparatus
- 88Retained apparatus: protection
- 89Expenses
- 90Indemnity
- 91Enactments and agreements
- 92Co-operation
- 93Access
- 94Arbitration
- 95Notices
- Part 9: Protection for Cadent Gas Limited
- 96Application
- 97Interpretation
- 98On street apparatus
- 99Apparatus of Cadent in closed streets
- 100Acquisition of land
- 101Removal of apparatus
- 102Facilities and rights for alternative apparatus
- 103Retained apparatus: protection of Cadent
- 104Expenses
- 105Indemnity
- 106Enactments and agreements
- 107Co-operation
- 108Access
- 109Arbitration
- 110Notices
- Part 10: Protection for Network Rail Infrastructure Limited
- 111Paragraph 111
- 112Paragraph 112
- 113Paragraph 113
- 114Paragraph 114
- 115Paragraph 115
- 116Paragraph 116
- 117Paragraph 117
- 118Paragraph 118
- 119Paragraph 119
- 120Paragraph 120
- 121Paragraph 121
- 122Paragraph 122
- 123Paragraph 123
- 124Paragraph 124
- 125Paragraph 125
- 126Paragraph 126
- 127Paragraph 127
- 128Paragraph 128
- 129Paragraph 129
- 130Paragraph 130
- 131Paragraph 131
- 132Paragraph 132
- Part 11: Protection for Perenco Gas (UK) Limited, Perenco North Sea Limited, Everard Energy Limited, Ithaca MA Limited, and RockRose (UKCS2) Limited
- 133Application
- 134Interpretation
- 135Restriction on authorised development
- 136Submission and approval of plans
- 137Co-existence and proximity agreement
- 138Provision of information
- 139Arbitration
- Part 12: Protection for Shell U.K. Limited and Esso Exploration and Production UK Limited
- 140Application
- 141Interpretation
- 142Restriction on authorised development
- 143Coexistence and proximity agreement
- 144Provision of information
- 145Arbitration
- Part 13: Protection for Lincs Wind Farm Limited
- 146Application
- 147Interpretation
- 148Control of works within the Lincs control area
- 149Arbitration
- Part 14: Protection for Race Bank Wind Farm Limited
- 150Application
- 151Interpretation
- 152Control of works within the Race Bank control area
- 153Arbitration
- Part 15: Protection for Dudgeon Extension Limited
- 154Application
- 155Interpretation
- 156Control of works within the DEP control area
- 157Arbitration
- Part 16: Protection for Spalding Energy Company Limited and Spalding Energy Expansion Limited
- 158Application
- 159Application
- 160On Street Apparatus
- 161Apparatus of Spalding Energy in closed streets
- 162Acquisition of land
- 163Removal of apparatus
- 164Facilities and rights for alternative apparatus
- 165Retained apparatus: protection
- 166Expenses
- 167Indemnity
- 168Enactments and agreements
- 169Co-operation
- 170Access
- 171Arbitration
- 172Notices
- Schedule 19: Arbitration Rules
- 1Primary objective
- 2Time periods
- 3Timetable
- 4Procedure
- 5Arbitrator’s powers
- 6Costs
- 7Confidentiality
- 8Conservatory and Interim Measures
- Schedule 20: Procedure for discharge of requirements
- 1Applications made for certain approvals
- 2Further information
- 3Appeals
- 4Fees
- 5Interpretation of this Schedule
- Schedule 21: Documents to be certified
- 1Documents forming the environmental statement to be certified
- 2Other Documents to be certified
- Schedule 22: Compensation provisions
- Part 1: Flamborough and Filey Coast Special Protection Area: Kittiwake Compensation Measures
- 1Paragraph 1
- 2Paragraph 2
- 3Marine Recovery Fund
- 4Kittiwake CIMP
- 5Kittiwake CIMP
- 6Kittiwake CIMP
- 7Kittiwake CIMP
- 8Kittiwake CIMP
- 9Kittiwake CIMP
- 10Kittiwake CIMP
- 11Kittiwake CIMP
- 12Kittiwake CIMP
- Part 2: Flamborough and Filey Coast Special Protection Area and Farne Islands Special Protection Area: Guillemot Compensation Measures
- 13Paragraph 13
- 14Paragraph 14
- 15Marine Recovery Fund
- 16Guillemot CIMP
- 17Guillemot CIMP
- 18Guillemot CIMP
- 19Guillemot CIMP
- 20Guillemot CIMP
- 21Guillemot CIMP
- 22Guillemot CIMP
- 23Guillemot CIMP
- 24Guillemot CIMP
- 25Guillemot CIMP
- Part 3: Inner Dowsing, Race Bank and North Ridge Special Area of Conservation: Sandbank Compensation Measures
- 26Paragraph 26
- 27Paragraph 27
- 28Paragraph 28
- Part 4: Inner Dowsing, Race Bank and North Ridge Special Area of Conservation: Reef Compensation Measures
- 29Paragraph 29
- 30Paragraph 30
- 31Paragraph 31
- Explanatory note