Paragraph 12 Design parameters

Original text. Later amendments are not shown.

(1)

The total length of the cables forming part of the authorised scheme and the authorised scheme in licence 2 (transmission) and the volume and area of their cable protection must not exceed the following (whether installed under this licence or licence 2 (transmission))—

WorkLengthArea of cable protectionVolume of cable protection
Work No. 1(b) (array cable)377.42km1,270,357m21,214,494m3
Work No. 4 (interlink cables)123.75km406,438m2399,234m3
(2)

The total number of cable crossings in respect of the array cables comprised within Work No. 1(b) must not exceed 30, unless otherwise agreed with the MMO.