Paragraph 12 Design parameters
(1)
The total length of the cables forming part of the authorised scheme and the authorised scheme in licence 2 (transmission) and the volume and area of their cable protection must not exceed the following (whether installed under this licence or licence 2 (transmission))—
| Work | Length | Area of cable protection | Volume of cable protection |
|---|---|---|---|
| Work No. 1(b) (array cable) | 377.42km | 1,270,357m2 | 1,214,494m3 |
| Work No. 4 (interlink cables) | 123.75km | 406,438m2 | 399,234m3 |
(2)
The total number of cable crossings in respect of the array cables comprised within Work No. 1(b) must not exceed 30, unless otherwise agreed with the MMO.