| 6.1 | APP-055 to APP-086 | Environmental Statement | 1 | 19 March 2024 |
| 6.2 | APP-087 to APP-139 | Figures | 1 | 19 March 2024 |
| 6.3 | APP-140 to APP-234 | Appendices | 1 | 19 March 2024 |
| 6.1 | REP5-007 | Non-Technical Summary | 2 | 13 March 2025 |
| 6.1.3 | REP5-009 | Chapter 3 Project Description | 2 | 13 March 2025 |
| 6.1.4 | REP5-013 | Chapter 4 Site Selection and Consideration of Alternatives | 2 | 13 March 2025 |
| 6.1.5 | REP5-015 | Chapter 5 EIA Methodology | 2 | 13 March 2025 |
| 6.1.7 | REP4a-029 | Chapter 7 Marine Physical Processes | 2 | 26 February 2025 |
| 6.1.8 | REP5-017 | Chapter 8 Marine Water and Sediment Quality | 3 | 13 March 2025 |
| 6.1.9 | REP6-018 | Chapter 9 Benthic and Intertidal Ecology | 3 | 4 April 2025 |
| 6.1.10 | REP5-021 | Chapter 10 Fish and Shellfish Ecology | 2 | 13 March 2025 |
| 6.1.11 | C1-019 | Chapter 11 Marine Mammals | 3 | 9 September 2025 |
| 6.1.12 | C1-020 | Chapter 12 Offshore and Intertidal Ornithology | 3 | 9 September 2025 |
| 6.1.13 | REP5-025 | Chapter 13 Marine and Intertidal Archaeology | 2 | 13 March 2025 |
| 6.1.14 | REP5-027 | Chapter 14 Commercial Fisheries | 2 | 13 March 2025 |
| 6.1.15 | REP5-029 | Chapter 15 Shipping and Navigation | 2 | 13 March 2025 |
| 6.1.16 | REP5-031 | Chapter 16 Aviation, Radar, Military and Communication | 3 | 13 March 2025 |
| 6.1.17 | REP5-033 | Chapter 17 Seascape, Landscape and Visual | 3 | 13 March 2025 |
| 6.1.18 | REP5-035 | Chapter 18 Marine Infrastructure and Other Users | 2 | 13 March 2025 |
| 6.1.19 | REP4a-013 | Chapter 19 Onshore Air Quality | 3 | 26 February 2025 |
| 6.1.20 | REP5-037 | Chapter 20 Onshore Archaeology and Cultural Heritage | 3 | 13 March 2025 |
| 6.1.21 | REP5-039 | Chapter 21 Onshore Ecology | 2 | 13 March 2025 |
| 6.1.22 | REP5-043 | Chapter 22 Onshore Ornithology [Confidential] | 2 | 13 March 2025 |
| 6.1.23 | REP4a-015 | Chapter 23 Geology and Ground Conditions | 2 | 26 February 2025 |
| 6.1.24 | REP4a-017 | Chapter 24 Onshore Hydrology Hydrogeology and Flood Risk | 2 | 26 February 2025 |
| 6.1.25 | REP6-022 | Chapter 25 Land Use | 4 | 4 April 2025 |
| 6.1.26 | REP4a-021 | Chapter 26 Noise and Vibration | 2 | 26 February 2025 |
| 6.1.27 | REP4a-023 | Chapter 27 Traffic and Transport | 3 | 26 February 2025 |
| 6.1.28 | REP4a-025 | Chapter 28 Landscape and Visual Assessment | 2 | 26 February 2025 |
| 6.1.29 | REP4a-127 | Chapter 29 Socio-Economic Characteristics | 2 | 26 February 2025 |
| 6.1.30 | AS1-054 | Chapter 30 Human Health | 2 | 31 July 2024 |
| 6.1.31 | REP5-011 | Chapter 31 Climate Change | 2 | 13 March 2025 |
| 6.2.3 | REP5-045 | Chapter 3 Project Description Figures | 2 | 13 March 2025 |
| 6.2.4 | REP5-046 | Chapter 4 Site Selection and Consideration of Alternatives Figures | 2 | 13 March 2025 |
| 6.2.5 | REP5-047 | Chapter 5 EIA Methodology Figures | 2 | 13 March 2025 |
| 6.2.7 | REP4a-041 | Chapter 7 Marine Physical Processes Figures (Part 1 of 2) | 2 | 26 February 2025 |
| 6.2.7 | REP4a-042 | Chapter 7 Marine Physical Processes Figures (Part 2 of 2) | 2 | 26 February 2025 |
| 6.2.8 | REP5-048 | Chapter 8 Marine Water and Sediment Quality Figures | 3 | 13 March 2025 |
| 6.2.9 | REP5-049 | Chapter 9 Benthic and Intertidal Ecology Figures | 2 | 13 March 2025 |
| 6.2.10 | REP5-050 | Chapter 10 Fish and Shellfish Ecology Figures (Part 1 of 2) | 2 | 13 March 2025 |
| 6.2.10 | REP5-051 | Chapter 10 Fish and Shellfish Ecology Figures (Part 2 of 2) | 2 | 13 March 2025 |
| 6.2.11 | REP5-052 | Chapter 11 Marine Mammals Figures | 2 | 13 March 2025 |
| 6.2.12 | REP4a-030 | Chapter 12 Offshore and Intertidal Ornithology Figures | 2 | 26 February 2025 |
| 6.2.13 | REP5-053 | Chapter 13 Marine and Intertidal Archaeology Figures | 2 | 13 March 2025 |
| 6.2.14 | REP5-054 | Chapter 14 Commercial Fisheries Figures | 2 | 13 March 2025 |
| 6.2.15 | REP5-055 | Chapter 15 Shipping and Navigation Figures | 2 | 13 March 2025 |
| 6.2.16 | REP5-056 | Chapter 16 Aviation, Radar, Military and Communication Figures | 2 | 13 March 2025 |
| 6.2.17 | REP5-057 | Chapter 17 Seascape, Landscape and Visual Figures (Part 1 of 3) | 3 | 13 March 2025 |
| 6.2.17 | REP5-058 | Chapter 17 Seascape, Landscape and Visual Figures (Part 2 of 3) | 3 | 13 March 2025 |
| 6.2.17 | REP5-059 | Chapter 17 Seascape, Landscape and Visual Figures (Part 3 of 3) | 3 | 13 March 2025 |
| 6.2.18 | REP5-060 | Chapter 18 Marine Infrastructure and Other Users Figures | 2 | 13 March 2025 |
| 6.2.19 | REP4a-031 | Chapter 19 Onshore Air Quality Figures | 2 | 26 February 2025 |
| 6.2.21 | REP5-061 | Chapter 21 Onshore Ecology Figures (Part 1 of 2) | 3 | 13 March 2025 |
| 6.2.21 | REP5-062 | Chapter 21 Onshore Ecology Figures (Part 2 of 2) | 2 | 13 March 2025 |
| 6.2.22 | REP5-063 | Chapter 22 Onshore Ornithology Figures | 2 | 13 March 2025 |
| 6.2.23 | REP4a-032 | Chapter 23 Geology and Ground Conditions Figures | 3 | 26 February 2025 |
| 6.2.24 | REP4a-033 | Chapter 24 Onshore Hydrology Hydrogeology and Flood Risk Figures | 2 | 26 February 2025 |
| 6.2.25 | REP4a-034 | Chapter 25 Land Use Figures | 3 | 26 February 2025 |
| 6.2.26 | REP4a-035 | Chapter 26 Noise and Vibration Figures | 2 | 26 February 2025 |
| 6.2.27 | REP4a-036 | Chapter 27 Traffic and Transport Figures | 3 | 26 February 2025 |
| 6.2.28 | REP4a-037 | Chapter 28 Landscape and Visual Assessment Figures (Part 1 of 15) | 2 | 26 February 2025 |
| 6.2.28 | REP4a-038 | Chapter 28 Landscape and Visual Assessment Figures (Part 2 of 15) | 2 | 26 February 2025 |
| 6.2.28 | REP4a-039 | Chapter 28 Landscape and Visual Assessment Figures (Part 3 of 15) | 2 | 26 February 2025 |
| 6.3.3.2 | REP6-024 | Chapter 3 Appendix 2 Onshore Crossing Schedule | 8 | 4 April 2025 |
| 6.3.5.2 | REP5-064 | Chapter 5 Appendix 2 Offshore Cumulative Effects Assessment Approach | 2 | 13 March 2025 |
| 6.3.5.3 | REP5-066 | Chapter 5 Appendix 3 Onshore Cumulative Effects Assessment Approach | 2 | 13 March 2025 |
| 6.3.7.1 | AS-003 | Chapter 7 Appendix 1 Physical Processes Technical Baseline | 2 | 29 May 2024 |
| 6.3.9.2 | REP4a-069 | Chapter 9 Appendix 2 Benthic Ecology Technical Report (ECC) | 4 | 26 February 2025 |
| 6.3.9.6 | REP4a-070 | Chapter 9 Appendix 6 Envision Offshore Export Cable Corridor Sabellaria Spinulosa Reanalysis and Report | 3 | 26 February 2025 |
| 6.3.10.1 | REP5-068 | Chapter 10 Appendix 1 Fish and Shellfish Ecology Technical Baseline | 2 | 13 March 2025 |
| 6.3.11.2 | REP5-070 | Chapter 11 Appendix 2 Underwater Noise Assessment | 2 | 13 March 2025 |
| 6.3.11.3 | REP6-026 | Interim population consequences of disturbance modelling report (cumulative) | 1 | 4 April 2025 |
| 6.3.12.1 | REP4a-043 | Chapter 12 Appendix 1 Intertidal and Offshore Ornithology Technical Baseline | 3 | 26 February 2025 |
| 6.3.12.2 | REP4a-044 | Chapter 12 Appendix 2 Collision Risk Modelling | 2 | 26 February 2025 |
| 6.3.12.3 | REP4a-045 | Chapter 12 Appendix 3 Displacement Assessment | 2 | 26 February 2025 |
| 6.3.12.4 | REP4a-046 | Chapter 12 Appendix 4 Population Viability Analysis | 2 | 26 February 2025 |
| 6.3.12.5 | REP4a-047 | Chapter 12 Appendix 5 Migratory Collision Risk Modelling | 3 | 26 February 2025 |
| 6.3.12.6 | REP4-018 | Chapter 12 Appendix 6 MRSea Modelling for Offshore Ornithology | 2 | 3 February 2025 |
| 6.3.12.7 | REP4a-048 | Chapter 12 Appendix 7 Levels of precaution in the assessment and compensation calculations for offshore ornithology | 2 | 26 February 2025 |
| 6.3.12.8 | REP4a-050 | Chapter 12 Appendix.8 Consideration of bioseasons in the assessment of guillemot | 2 | 26 February 2025 |
| 6.3.12.9 | REP4a-052 | Appendix 12.9 Rates of displacement in guillemot and razorbill | 2 | 26 February 2025 |
| 6.3.15.1 | REP5-072 | Chapter 15 Appendix 1 Navigational Risk Assessment | 2 | 13 March 2025 |
| 6.3.18.2 | REP5-075 | Chapter 18 Appendix 2 Helicopter Access Report – Hornsea One and Two RCS | 1 | 13 March 2025 |
| 6.3.19.1 | AS1-066 | Chapter 19 Appendix 1 Construction Phase Dust Assessment Methodology | 2 | 31 July 2024 |
| 6.3.19.4 | REP4a-054 | Chapter 19 Appendix 4 Road Traffic Dispersion Modelling | 2 | 26 February 2025 |
| 6.3.20.1 | REP5-076 | Chapter 20 Appendix 1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment (Part 1 of 10) | 2 | 13 March 2025 |
| 6.3.20.1 | REP5-079 | Chapter 20 Appendix 1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment (Part 2a of 10) | 2 | 13 March 2025 |
| 6.3.20.1 | REP5-080 | Chapter 20 Appendix 1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment (Part 2b of 10) | | 13 March 2025 |
| 6.3.20.1 | REP5-081 | Chapter 20 Appendix 1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment (Part 3 of 10) | 2 | 13 March 2025 |
| 6.3.20.1 | REP5-082 | Chapter 20 Appendix 1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment (Part 4 of 10) | 2 | 13 March 2025 |
| 6.3.20.1 | REP5-084 | Chapter 20 Appendix 1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment (Part 5 of 10) | 2 | 13 March 2025 |
| 6.3.20.1 | REP5-085 | Chapter 20 Appendix 1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment (Part 6 of 10) | 2 | 13 March 2025 |
| 6.3.20.1 | REP5-086 | Chapter 20 Appendix 1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment (Part 7 of 10) | 2 | 13 March 2025 |
| 6.3.20.1 | REP5-087 | Chapter 20 Appendix 1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment (Part 8 of 10) | 2 | 13 March 2025 |
| 6.3.20.1 | REP5-088 | Chapter 20 Appendix 1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment (Part 9 of 10) | 2 | 13 March 2025 |
| 6.3.20.1 | REP5-078 | Chapter 20 Appendix 1 Onshore Archaeology and Cultural Heritage Desk-Based Assessment (Part 10 of 10) | 2 | 13 March 2025 |
| 6.3.21.5 | REP5-098 | Chapter 21 Appendix 5 Badger Desk Study and Field Survey CONFIDENTIAL | 2 | 13 March 2025 |
| 6.3.22.2 | REP5-089 | Chapter 22 Appendix 2 Ornithology Desk Study Annex [Confidential] | 2 | 13 March 2025 |
| 6.3.22.3 | REP5-091 | Chapter 22 Appendix 3 Winter Bird Survey 2022-2023 Part 1 of 4 | 2 | 13 March 2025 |
| 6.3.22.3 | REP5-093 | Chapter 22 Appendix 3 Winter Bird Survey 2022-2023 Part 2 of 4 | 2 | 13 March 2025 |
| 6.3.22.3 | REP5-094 | Chapter 22 Appendix 3 Winter Bird Survey 2022-2023 Part 3 of 4 | 2 | 13 March 2025 |
| 6.3.22.3 | REP5-095 | Chapter 22 Appendix 3 Winter Bird Survey 2022-2023 Part 4 of 4 | 2 | 13 March 2025 |
| 6.3.22.7`` | REP5-096 | Chapter 22 Appendix 7 Winter Bird Survey 2023-2024 | 2 | 13 March 2025 |
| 6.3.22.8 | REP5-097 | Additional clarifications relating to Natural England’s Relevant Representations (Appendix I Onshore Ornithology) | 2 | 13 March 2025 |
| 6.3.23.1 | REP4a-056 | Chapter 23 Appendix 1 Preliminary Land Quality Risk Assessment | 3 | 26 February 2025 |
| 6.3.24.1 | REP4a-058 | Chapter 24 Appendix 1 Groundwater Risk Assessment | 2 | 26 February 2025 |
| 6.3.24.2 | REP4-022; REP4-024 | Chapter 24 Appendix 2 Flood Risk Assessment: Onshore ECC and 400kV Cable Corridor | 4 | 3 February 2025 |
| 6.3.24.3 | REP4-027 to REP4-028 | Chapter 24 Appendix 3 Flood Risk Assessment: Onshore Substation | 4 | 3 February 2025 |
| 6.3.25.1 | REP4a-060 | Chapter 25 Appendix 1 BMV Regional and National Context | 1 | 26 February 2025 |
| 6.3.26.4 | REP4a-061 | Chapter 26 Appendix 4 Noise Model Outputs | 2 | 26 February 2025 |
| 6.3.27.1 | REP4a-063 | Chapter 27 Appendix 1 Transport Assessment | 3 | 26 February 2025 |
| 6.3.27.1 | REP4a-066 | Chapter 27 Appendix 1 Transport Assessment Annex A Special Order AIL Swept Path Analysis | 3 | 26 February 2025 |
| 6.3.27.1 | AS1-088 | Chapter 27 Appendix 1 Transport Assessment Annex B DfT Traffic Data | 2 | 31 July 2024 |
| 6.3.27.1 | AS1-089 | Chapter 27 Appendix 1 Transport Assessment Annex C Automatic Traffic Count Data | 2 | 31 July 2024 |
| 6.3.27.1 | AS1-090 | Chapter 27 Appendix 1 Transport Assessment Annex F Construction Access General Arrangement Drawings | 2 | 31 July 2024 |
| 6.3.27.1 | AS1-091 | Chapter 27 Appendix 1 Transport Assessment Annex G Core and Local Construction Vehicle Access Routes | 2 | 31 July 2024 |
| 6.3.27.1 | REP4a-065 | Chapter 27 Appendix 1 Transport Assessment Annex I Public Rights of Way | 2 | 26 February 2025 |
| 6.3.27.1 | AS1-092 | Chapter 27 Appendix 1 Transport Assessment Annex J Trip Generation Calculations | 2 | 31 July 2024 |
| 6.3.27.1 | AS1-093 | Chapter 27 Appendix 1 Transport Assessment Annex K Daylight Hours Availability | 2 | 31 July 2024 |
| 6.3.27.1 | AS1-094 | Chapter 27 Appendix 1 Transport Assessment Annex N Passing Place Proposals | 2 | 31 July 2024 |
| 6.3.31.1 | REP5-100 | Chapter 31 Appendix 1 Carbon payback sensitivity analysis: wake effects | 1 | 13 March 2025 |
| 15.6 | PD1-074 | Erratum to Site Selection Report | 1 | 19 September 2024 |
| 15.7 | REP4-095 | Noise Bund Hydraulic Modelling Report including Appendix C Figures (Part 1 of 4) | 3 | 3 February 2025 |
| 15.7 | REP4-096 | Noise Bund Hydraulic Modelling Report Appendix C Figures (Part 2 of 4) | 3 | 3 February 2025 |
| 15.7 | REP4-097 | Noise Bund Hydraulic Modelling Report Appendix C Figures (Part 3 of 4) | 3 | 3 February 2025 |
| 15.7 | REP4-098 | Noise Bund Hydraulic Modelling Report Appendix C Figures (Part 4 of 4) | 3 | 3 February 2025 |
| 15.8 | PD1-080 | Onshore Archaeological Geophysical Report | 1 | 19 September 2024 |
| 15.9 | PD1-081 | Environmental Report for the Offshore Restricted Build Area and Revision to the Offshore Export Cable Corridor | 1 | 19 September 2024 |
| 15.9A | PD1-082 to PD1-083 | Offshore Restricted Build Area and Revision to the Offshore Export Cable Corridor Appendix A Figures | 1 | 19 September 2024 |
| 15.9B | PD1-084 | Offshore Restricted Build Area and Revision to the Offshore Export Cable Corridor Appendix B Blockage Modelling Results | 1 | 19 September 2024 |
| 15.9C | PD1-085 | Offshore Restricted Build Area and Revision to the Offshore Export Cable Corridor Appendix C Underwater Noise Modelling Report | 1 | 19 September 2024 |
| 15.9D | PD1-086 | Offshore Restricted Build Area and Revision to the Offshore Export Cable Corridor Appendix D Ornithology Baseline Summary | 1 | 19 September 2024 |
| 15.9E | PD1-087 | Offshore Restricted Build Area and Revision to the Offshore Export Cable Corridor Appendix E Collision Risk Modelling | 1 | 19 September 2024 |
| 15.9F | PD1-088 | Offshore Restricted Build Area and Revision to the Offshore Export Cable Corridor Appendix F Offshore Ornithology Displacement Assessment | 1 | 19 September 2024 |
| 15.9G | PD1-089 | Offshore Restricted Build Area and Revision to the Offshore Export Cable Corridor Appendix G MRSea Modelling for Offshore Ornithology | 1 | 19 September 2024 |
| 15.9H | PD1-090 | Offshore Restricted Build Area and Revision to the Offshore Export Cable Corridor Appendix H Review of Obstacle Free Zone Impact on Shipping Displacement and Collision Risk | 1 | 19 September 2024 |
| 15.15 | PD1-097 | Disposal Site Characterisation Report | 1 | 19 September 2024 |