Paragraph 12 Design parameters
(1)
The total length of the cables forming part of the authorised scheme and the authorised scheme in licence 1 (generation) and the volume and area of their cable protection must not exceed the following (whether installed under this licence or licence 1 (generation))—
| Work No. | Length | Area of cable protection | Volume of cable protection |
|---|---|---|---|
| Work No. 4 (interlink cables) | 123.75km | 406,438m2 | 399,234m3 |
| Work Nos. 5 and 11 (offshore export cables) | 440km | 1,524,870m2 | 1,457,579m3 |
(2)
The total number of cable crossings must not exceed—
(a)
16, in respect of the interlink cables comprised within Work No. 4; and
(b)
38, in respect of the offshore export cables comprised within Work No. 5,
unless otherwise agreed with the MMO.