The Patents (Extension of Time) (Federal Republic of Germany) (Amendment) Rules 1951 in Scotland
S.I. 1951/1632 · Made 5 September 1951
The printed text
legislation.gov.uk holds this item only as a scan of the printed copy. Open the PDF (154.6 KB).
S.I. 1951/1632 · Made 5 September 1951
legislation.gov.uk holds this item only as a scan of the printed copy. Open the PDF (154.6 KB).