The Patents (Extension of Time) (Federal Republic of Germany) Rules 1951 in Scotland
S.I. 1951/457 · Made 16 March 1951
The printed text
legislation.gov.uk holds this item only as a scan of the printed copy. Open the PDF (175.6 KB).
S.I. 1951/457 · Made 16 March 1951
legislation.gov.uk holds this item only as a scan of the printed copy. Open the PDF (175.6 KB).