The Patents (Extension of Time) (Israel) Rules 1950 in Northern Ireland
S.I. 1950/2024 · Made 14 December 1950
The printed text
legislation.gov.uk holds this item only as a scan of the printed copy. Open the PDF (259.5 KB).
S.I. 1950/2024 · Made 14 December 1950
legislation.gov.uk holds this item only as a scan of the printed copy. Open the PDF (259.5 KB).