OpenLegislation

Part 2 Local developmentC1C2C3C4

England and Wales

Changes not yet applied. Later legislation changes this provision in ways not yet written into the text below:

  1. Survey
  2. Register
  3. Development schemes
  4. Plan timetables
  5. Local, minerals and waste and supplementary plans
  6. Examination of plans
  7. Withdrawal and adoption of plans
  8. Requirement in relation to design code
  9. Revocation and revision of plans
  10. Intervention powers in relation to plans
  11. Joint plans
  12. Joint committees
  13. General
  14. Documents
  15. Joint committees
  16. Miscellaneous
  17. General

Annotations

Modifications

C1

Pt. 2 modified (temp.) (28.11.2008) by Local Government (Structural Changes) (Transitional Arrangements) (No.2) Regulations 2008 (S.I. 2008/2867), regs. 1(1), 21(1), 23(2) (with reg. 1(2))

C2

Pt. 2 modified (25.3.2026) by The Planning and Compulsory Purchase Act 2004 (Local Planning) (Modification and Consequential Amendments) (England) Regulations 2026 (S.I. 2026/170), regs. 1(2), 7

C3

Pt. 2 applied (25.3.2026) by The Town and Country Planning (Local Planning) (England) Regulations 2026 (S.I. 2026/186), regs. 1(2), 78(8) (with Sch.)

C4

Pt. 2 modified (16.4.2026) by S.I. 2026/170, reg. 7A (as inserted by The Planning and Compulsory Purchase Act 2004 (Local Planning) (Modification and Consequential Amendments) (England) (Amendment) Regulations 2026 (S.I. 2026/350), regs. 1(2), 2)