Paragraph 12 Cost-benefit analysisF1
Paragraphs 3 to 11 shall not apply to—
peak load and back-up electricity generating installations for which the application states that operation under 1,500 operating hours per year as a rolling average over a period of five years is planned; or
installations that need to be located close to a geological storage site approved under Directive 2009/31/EC F2as last amended by Directive 2011/92/EU .