Schedule NEW PART 6 OF SCHEDULE 3 TO THE POLLUTION PREVENTION AND CONTROL (SCOTLAND) REGULATIONS 2000I1
Scotland Not yet in force
“PART 6:
REFUELLING INSTALLATIONS
26(1)The prescribed date for a new refuelling installation is 1st January 2012.
(2)The prescribed date for an existing refuelling installation is–
(a)where an application for a permit to operate the existing refuelling installation is made by 1st January 2012, the determination date for that existing refuelling installation; or
(b)where no such application is made, 1st January 2012.
(3)Where an installation which is subject to a permit under these Regulations contains an existing refuelling installation, the operator shall not operate that installation after the relevant prescribed date specified in sub-paragraph (2) except under and to the extent authorised by a variation of the conditions of that permit granted by SEPA under regulation 13.
(4)In this Part–
“determination date” has the same meaning as in paragraph 6 of Part 1 of Schedule 3; and
“existing refuelling installation” means an installation where an activity falling within paragraph (d) of Part B of Section 1.2 of Schedule 1 is carried out;
“new refuelling installation” means an installation where an activity falling within paragraph (e) of Part B of Section 1.2 of Schedule 1 is carried out.”
Annotations
Commencement
- I1
Sch. in force at 19.1.2009, see reg. 1