Paragraph 2 I1
United Kingdom
The works referred to in article 5(1) are as follows.
-
Dredging Work No. 1: an area of the River Severn for use as a berthing pocket for vessels to a maximum dredged depth of 18 metres below Chart Datum (unless the Secretary of State shall approve otherwise in writing), being the area bounded by a line commencing on the face of the new quay authorised as part of Work No. 1 at Point D1B passing in a north-eastwards direction along that face to Point D1C then turning and passing in a generally northwards or north-westwards direction to Point D1D then turning and passing in a south-westward direction to Point D1A on the inner face of the breakwater authorised by Work No. 3 then returning in a south-eastwards direction along that face to terminate at Point D1B, as shown on sheet 11 of the deposited plans.
-
Dredging Work No. 2: an area of the River Severn for use as a manoeuvring area and turning circle for vessels to a maximum dredged depth of 14 metres below Chart Datum (unless the Secretary of State shall approve otherwise in writing), being the area bounded—
- (a)
to the south-east by the berthing pocket authorised to be dredged by Dredging Work No.1;
- (b)
to the south-west by the inner face of the breakwater authorised by Work No. 3;
- (c)
to the west-south-west by the end of the deep water channel authorised to be dredged by Dredging Work No. 3; and
- (d)
to the north-east and north-west by a line commencing at the north-western limit of such deep water channel and returning in an arc in a generally north-westwards and then westwards direction to terminate at the northernmost extremity of the berthing pocket described in sub-paragraph (a).
- (a)
-
Dredging Work No. 3: to widen and deepen the existing approach channel to provide access to the works for vessels on all states of the tide, an area of the River Severn—
- (a)
within the area 850 metres wide having its centre line commencing at a point at latitude 51º26’.204N, longitude 003º00’.685W and proceeding generally north-eastwards terminating at a point at latitude 51º30’.811N, longitude 002º43’.561W (shown for illustration only on sheet 12 of the deposited plans);
- (b)
the resulting channel not to exceed—
- (i)
380 metres in width at the base of the channel in the area to the west of Portishead Point; and
- (ii)
450 metres in width at the base of the channel in the area to the east of Portishead Point; and
- (i)
- (c)
dredged to a maximum depth of 14 metres below Chart Datum (unless the Secretary of State shall approve otherwise in writing).
- (a)
-
Dredging Work No. 4: an area of the River Severn to create a training channel—
- (a)
commencing on the northern boundary of the manoeuvring area and turning circle authorised to be dredged by Dredging Work No. 2 and extending in a generally northerly direction for 500 metres;
- (b)
not exceeding 210 metres in width at the base of the channel; and
- (c)
dredged to a maximum depth of 14 metres below Chart Datum (unless the Secretary of State shall approve otherwise in writing).
- (a)
-
Dredging Work No. 5: works ancillary to Work Nos. 1 and 3 as required—
- (a)
to create or accommodate foundations for Work No. 1 and facilitate the reclamation authorised by Work No. 1, to a maximum dredged depth of 21.5 metres below Chart Datum; and
- (b)
to create or accommodate foundations for Work No. 3, at the inshore end of Work No. 3 adjacent to North Pier to a maximum dredged depth of 8 metres below Chart Datum and following the line of and falling at the offshore end of Work No. 3 to a maximum dredged depth of 12 metres below Chart Datum,
unless in each case the Secretary of State shall approve otherwise in writing.
- (a)
Annotations
Commencement
- I1
Sch. 3 para. 2 in force at 1.9.2010, see art. 1(1)