Article 2 Corrections to the Portishead Branch Line (MetroWest Phase 1) Order 2022
The Portishead Branch Line (MetroWest Phase 1) Order 2022 is corrected as set out in the table in the Schedule of this Order, where—
(a)
column 1 sets out where the correction is to be made;
(b)
column 2 sets out how the correction is to be made; and
(c)
column 3 sets out the text to be substituted, inserted or omitted.