Article 4 Power to deviate
In constructing or maintaining the scheduled works, the undertaker may—
(a)
deviate laterally from the situations shown on the deposited plans for a distance not exceeding 5 metres within the limits of deviation for construction purposes;
(b)
deviate vertically from the levels shown for that work on the deposited section—
(i)
to any extent not exceeding 5 metres upwards, or
(ii)
to any extent downwards as may be necessary or convenient.