Schedule
| Provision | How correction is to be made | Text to be submitted, inserted or omitted |
|---|---|---|
Schedule 1, Work No. 7 | After the word “Schedule”, insert After the word “Requirements”, insert | A comma A comma and the word “and” |
| Article 6(1) | For paragraph (1), substitute |
|
| Schedule 1, Work No. 1 | After the word “gross”, insert | “rated” |
| Schedule 1, Work No. 7 | After the word “Schedule”, insert After the word “Requirements”, insert | A comma A comma and the word “and” |
| Schedule 2, Requirement 3(3), Detailed Design, in Table 2, in column 2 of the row beginning “Sealing end compound” (part of numbered Work 5) | For “12”, substitute | “12.5” |
| Schedule 2, Requirement 3(3) in Table 2, in column 2 of the row beginning “Substation: (gas insulated substation)- “(maximum compound size)” (part of numbered Work 5) | For “12”, substitute | “12.5” |
| Schedule 2, Requirement 3(3), in Table 2, in column 2 of the row beginning “Substation: (gas insulated substation)- “(indoor switchgear hall)” (part of numbered Work 5) | For “12”, substitute | “12.5” |
| Schedule 2, Requirement 5(2) | For “regulation 4”, substitute | “Requirement 4” |