OpenLegislation

Paragraph 5 E1

England, Wales and Scotland

Where F1an approved body finds that the essential requirements or the corresponding F2designated standards have not been met by the manufacturer, that body must require that manufacturer to take appropriate corrective measures and must not issue F3a Type examination certificate or quality system approval until the appropriate corrective measures have been taken.

Annotations

Textual amendments

F1

Words in Sch. 9 para. 5 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 29 para. 54(b) (with Sch. 29 para. 44) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)

F2

Word in Sch. 9 para. 5 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 29 para. 54(e) (with Sch. 29 para. 44) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)

F3

Words in Sch. 9 para. 5 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 29 para. 54(c) (with Sch. 29 para. 44) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)

Extent

E1

This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Notes on Schedule 9

Textual amendments

F1

Word in Sch. 9 heading substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 29 para. 54(a)(i) (with Sch. 29 para. 44) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)