Paragraph 5
In this Schedule—
“barrier” includes gate;
“cross” means cross otherwise than by tunnel or bridge;
“crossing sign”, in relation to a private road or path and any place where it crosses a railway, means—
- (a)
any object or device (whether fixed or portable), or
- (b)
any line or mark on the road or path,
for conveying to users of the road or path warnings, information, requirements, restrictions or prohibitions relating to the crossing;
- (a)
“fail” includes refuse;
“lawfully placed” means placed in accordance with paragraphs 1 to 3;
“maintain” includes repair and replace;
“place” includes erect and (in relation to a sign) display;
“private road or path” means any length of road or path to which the public does not have access.
In the case of a railway which has more than one operator, the powers conferred by paragraphs 1 to 3 shall only be exercisable by or in relation to the operator carrying on the undertaking which includes maintaining the permanent way.