Construction of railway Construction of railway
England, Wales and Northern Ireland
And with respect to the construction of the railway and the works connected therewith, be it enacted as follows:
- 6The construction of the railway to be subject to the provisions of this Act and the Lands Clauses Consolidation Act.
- 7Errors and omissions in plans to be corrected.
- 8Works not to be proceeded with until plans of all alterations authorized by Parliament have been deposited.
- 9Clerks of the peace, &c. to receive plans of alterations, and allow inspection.
- 10Copies of plans, &c. to be evidence.
- 11Limiting deviation from datum line described on sections, &c.
- 12Public notice to be given previous to making greater deviations.
- 13Arches, tunnels, &c. to be made as marked on deposited plans.
- 14Limiting deviations from gradients, curves, &c.
- 15Lateral deviations.
- 16Works to be executed.
- 17Works below high-water mark not to be executed without the consent of the lords of the admiralty.
- 18Alteration of water and gas pipes, &c.
- 19Company not to disturb pipes until they have laid down others.
- 20Pipes not to be laid contrary to any Act, and 18 inches surface road to be retained.
- 21Company to make good all damage.
- 22When railway crosses pipes, company to make a culvert.
- 23Penalty for obstructing supply of gas or water.
- 24Penalty for obstructing construction of railway.
- 25—29. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .