OpenLegislation

Paragraph 2.3.1 Requirements specific to each subsystem

Original text. Later amendments are not shown.

Safety

The control and command and signalling installation and procedures used on the trans-European high-speed rail system must enable trains to travel with a level of safety which corresponds to the objectives set for the network.