OpenLegislation

Regulation 17 Project subsystems: UK verification assessment procedureF19

(1)

The F1UK verification assessment procedure for F2an approved body carrying out an assessment F3... is—

(a)

in so far as that subsystem is required to conform with all or part of a F4NTSN, the procedures specified in the NTSN or part of the NTSN with which that subsystem is required to conform; and

(b)

the applicable procedure set out in F5Schedule 4.

(2)

The F6approved body carrying out an assessment F7... must—

(a)

compile a technical file containing—

(i)

the items required by section 2.4 of F8Schedule 4, including the certificate of verification;

(ii)

documents relating to the conditions and limits of use of the project subsystem;

(iii)

documents relating to the characteristics of the project subsystem;

(iv)

manuals and instructions relating to the servicing, constant or routine monitoring, adjustment and maintenance of the project subsystem;

(v)

documentation or records of any decision of the Competent Authority under regulation 13(8) as to the extent to which any F9NTSN applies to the project subsystem; and

F10(vi)

documentation or records of a determination of the Competent Authority in relation to an exemption from an applicable NTSN, pursuant to regulations 14 and 14A; and;

(b)

assess the interface between the project subsystem and the rail system to the extent that such an assessment is possible based on the available information referred to in paragraph (3).

(3)

The assessment under paragraph (2)(b) must be based on information available in the relevant F11NTSN and in any registers F12or lists kept in accordance with F13regulations 8 (Determination of type), 35 (Register of infrastructure) and 36 (National vehicle register).

(4)

The F14UK verification assessment procedure for a body carrying out an assessment in relation to F15UK specific rules is the applicable procedure set out in F16Schedule 4.

(5)

The body carrying out an assessment in relation to F17UK specific rules must compile a technical file in accordance with F18Schedule 4.

Annotations

Textual amendments

F1

Word in reg. 17(1) inserted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(b)(i)(aa); 2020 c. 1, Sch. 5 para. 1(1)

F2

Words in reg. 17(1) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(b)(i)(bb); 2020 c. 1, Sch. 5 para. 1(1)

F3

Words in reg. 17(1) omitted (31.12.2020) by virtue of The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(b)(i)(cc); 2020 c. 1, Sch. 5 para. 1(1)

F4

Word in reg. 17(1)(a) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(b)(ii); 2020 c. 1, Sch. 5 para. 1(1)

F5

Words in reg. 17(1)(b) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(b)(iii); 2020 c. 1, Sch. 5 para. 1(1)

F6

Words in reg. 17(2) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(c)(i)(aa); 2020 c. 1, Sch. 5 para. 1(1)

F7

Words in reg. 17(2) omitted (31.12.2020) by virtue of The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(c)(i)(bb); 2020 c. 1, Sch. 5 para. 1(1)

F8

Words in reg. 17(2)(a)(i) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(c)(ii)(aa); 2020 c. 1, Sch. 5 para. 1(1)

F9

Word in reg. 17(2)(a)(v) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(c)(ii)(bb); 2020 c. 1, Sch. 5 para. 1(1)

F10

Reg. 17(2)(a)(vi) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(c)(ii)(cc); 2020 c. 1, Sch. 5 para. 1(1)

F11

Word in reg. 17(3) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(d)(i); 2020 c. 1, Sch. 5 para. 1(1)

F12

Words in reg. 17(3) inserted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(d)(ii); 2020 c. 1, Sch. 5 para. 1(1)

F13

Words in reg. 17(3) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(d)(iii); 2020 c. 1, Sch. 5 para. 1(1)

F14

Word in reg. 17(4) inserted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(e); 2020 c. 1, Sch. 5 para. 1(1)

F15

Words in reg. 17(4) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(f)(i); 2020 c. 1, Sch. 5 para. 1(1)

F16

Words in reg. 17(4) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(f)(ii); 2020 c. 1, Sch. 5 para. 1(1)

F17

Words in reg. 17(5) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(f)(i); 2020 c. 1, Sch. 5 para. 1(1)

F18

Words in reg. 17(5) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(f)(ii); 2020 c. 1, Sch. 5 para. 1(1)

F19

Word in reg. 17 heading inserted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(23)(a); 2020 c. 1, Sch. 5 para. 1(1)