Regulation 20 Continuing duty on operator in relation to standards
This regulation applies where a project subsystem is in use on, or is part of, the rail system with an authorisation under these Regulations.
Subject to paragraph (3), the operator of the project subsystem must ensure that the project subsystem is operated and maintained—
where a TSI or notified national technical rule referred to in sub-paragraph (a) has been replaced by an NTSN or by an NTR, either in conformity with the relevant NTSN or NTR currently in force or in conformity with the original TSI or rule,
in conformity with any functional F6NTSN applying to that subsystem; and
in accordance with any condition in the authorisation to the extent that the condition still applies.
Where—
a project subsystem—
was assessed for authorisation against notified national technical rules that were the Rail Vehicle Accessibility Regulations 1998 M1 as in force when the project was assessed, or
is deemed under regulation 44(1)(b) to have been assessed against the requirements referred to in that sub-paragraph, and
an exemption order made or treated as having been made under section 183 of the Equality Act 2010 M2 has effect in relation to that project subsystem,
the duty in paragraph (2)(a) to ensure that the project subsystem is operated and maintained in conformity with those Regulations or requirements is a duty to do so save to the extent the order exempted it from those Regulations or requirements, even though the order may include a provision for the expiry of such exemption.
Paragraph (2) is without prejudice to regulation 45.
In this regulation—
“functional NTSN” means an NTSN applying to a functional subsystem;
“project subsystem” includes a vehicle deemed to be authorised under these Regulations by the operation of regulation 44.
Annotations
Textual amendments
- F1
Words in reg. 20(2)(a) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(26)(a)(i); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Words in reg. 20(2)(a) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(26)(a)(ii); 2020 c. 1, Sch. 5 para. 1(1)
- F3
Words in reg. 20(2)(b) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(26)(b)(i); 2020 c. 1, Sch. 5 para. 1(1)
- F4
Words in reg. 20(2)(b) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(26)(b)(ii); 2020 c. 1, Sch. 5 para. 1(1)
- F5
Reg. 20(2)(ba) inserted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(26)(c); 2020 c. 1, Sch. 5 para. 1(1)
- F6
Word in reg. 20(2)(c) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(26)(d); 2020 c. 1, Sch. 5 para. 1(1)
- F7
Reg. 20(5) substituted (31.12.2020) by The Railways (Interoperability) (Amendment) (EU Exit) Regulations 2019 (S.I. 2019/345), regs. 1(2), 2(26)(e); 2020 c. 1, Sch. 5 para. 1(1)
Marginal citations
- M1
S.I. 1998/2456, amended by S.I. 2000/3215 and S.I. 2008/1746 and revoked by S.I. 2010/432.
- M2
2010 c.15. See article 21(1) and schedule 7 of S.I. 2010/2317 for saving provisions.