Paragraph 5 E1I1
England, Wales and Scotland
Where, in the course of the monitoring of the conformity of the watercraft following the issue of a conformity assessment certificate, F1an approved body finds that a watercraft is no longer in compliance, it will require the manufacturer to take appropriate corrective measures and must suspend or withdraw the conformity assessment certificate if necessary.
Annotations
Textual amendments
- F1
Words in Sch. 12 para. 5 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 28 para. 53(d) (with Sch. 28 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
Commencement
- I1
Sch. 12 para. 5 in force at 3.8.2017, see reg. 1
Extent
- E1
This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only
Notes on Schedule 12
Textual amendments
- F1
Sch. 12 heading substituted (E.W.S) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 28 para. 53(a) (with Sch. 28 para. 41) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)