OpenLegislation

The Renewable Heat Incentive Scheme (Amendment) Regulations 2014 (revoked)

S.I. 2014/1413 · Made 27 May 2014 · Extends to England, Wales and Scotland

Up to date with all changes known to legislation.gov.uk, revised to 22 May 2018.

Energy

Made 27th May 2014

Coming into force in accordance with regulation 1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annotations to the whole text

Textual amendments

F1

Regulations revoked (22.5.2018) by The Renewable Heat Incentive Scheme Regulations 2018 (S.I. 2018/611), regs. 1, 92(2)(d) (with reg. 92(3)-(14))

Contents

  1. 1Citation and commencement Repealed
  2. 2Amendments to the Renewable Heat Incentive Scheme Regulations 2011 Repealed
  3. 3Amendments to regulation 2 (interpretation) Repealed
  4. 4Amendment to regulation 4 (eligible installations) Repealed
  5. 5Amendment to regulation 5 (eligible installations generating heat from solid biomass) Repealed
  6. 6Amendment to regulation 6 (eligible installations generating heat from solid biomass contained in municipal waste) Repealed
  7. 7Amendment to regulation 7 (eligible installations generating heat using solar collectors) Repealed
  8. 8Substitution of regulation 8 (eligible installations generating heat using heat pumps) Repealed
  9. 9Air source heat pumps Repealed
  10. 10Substitution of regulation 9 (eligible installations which are CHP systems) Repealed
  11. 11New solid biomass CHP systems Repealed
  12. 12Amendment to regulation 11 (eligible installations generating heat using biogas) Repealed
  13. 13Amendment to regulation 12 (other eligibility requirements for technologies) Repealed
  14. 14Substitution of regulation 13 (MCS certification for Microgeneration heating equipment) Repealed
  15. 15Amendments to regulation 15 (excluded plants) Repealed
  16. 16Metering in respect of new applications for accreditation in relation to ground source or air source heat pumps Repealed
  17. 17Amendment to regulation 22 (applications for accreditation) Repealed
  18. 18Substitution to regulation 23 (exceptions to duty to accredit) Repealed
  19. 19Amendments to regulation 25 (producers of biomethane) Repealed
  20. 20Amendments to regulation 26 (preliminary accreditation) Repealed
  21. 21Preliminary registration of biomethane producers Repealed
  22. 22Amendments to regulation 27 (interpretation) Repealed
  23. 23Amendments to regulation 28 (participants using solid biomass contained in municipal waste) Repealed
  24. 24Amendment to regulation 29 (Participants using solid biomass in accredited RHI installations with an installation capacity of 1MWth or above) Repealed
  25. 25Amendment to regulation 30 (participants using solid biomass in accredited RHI installations with an installation capacity between 45 kWth and 1 MWth) Repealed
  26. 26Amendment to regulation 31 (biogas produced from gasification or pyrolysis) Repealed
  27. 27Amendment to regulation 33 (biomethane producers) Repealed
  28. 28Amendments to regulation 34 (ongoing obligations: general) Repealed
  29. 29Substitution of regulation 37 Repealed
  30. 30Amendment to regulation 37A (calculation of initial tariffs on or after the relevant date) Repealed
  31. 31Amendments to regulation 37B (calculation of A) Repealed
  32. 32Amendment to regulation 37C (calculation of B) Repealed
  33. 33Amendment to regulation 37D (calculation of C) Repealed
  34. 34Amendments to regulation 37E (expenditure forecast statement and tariff change notice) Repealed
  35. 35Determination of increase in expenditure forecasts for 1st September 2014 expenditure forecast statement Repealed
  36. 36Amendment to regulation 39 Repealed
  37. 37Amendment to regulation 39A (periodic support payments for new accredited RHI installations) Repealed
  38. 38Periodic support payments for CHP systems using biomass or biogas in combination with other sources of energy Repealed
  39. 39Amendments to regulation 40 (fossil fuel contamination of solid biomass and fossil fuel used for permitted ancillary purposes) Repealed
  40. 40Amendment to regulation 41 (fossil fuel contamination adjustment to periodic support payments for producers and combusters of biogas produced from gasification and pyrolysis) Repealed
  41. 41Amendments to regulation 42 (periodic support payments to producers of biomethane) Repealed
  42. 42Substitution of regulation 43 (treatment of additional RHI capacity) Repealed
  43. 43Additional capacity for biomethane production Repealed
  44. 44Amendments to regulation 50 (power to inspect accredited RHI installations) Repealed
  45. 45Amendments to Schedule 1 (information required for accreditation and registration) Repealed
  46. 46Amendments to Schedule 3 (tariffs) Repealed
  47. 47New tariffs for plants generating heat from biomass with a capacity of 1MWth or above etc Repealed
  48. 48Substitution of Schedule 4 (total expenditure) Repealed
  49. 49Substitution of Schedule 5 (expenditure in relation to individual technologies) Repealed
  50. Signature
  51. Explanatory note

1Citation and commencementF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2Amendments to the Renewable Heat Incentive Scheme Regulations 2011F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3Amendments to regulation 2 (interpretation)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4Amendment to regulation 4 (eligible installations)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5Amendment to regulation 5 (eligible installations generating heat from solid biomass)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6Amendment to regulation 6 (eligible installations generating heat from solid biomass contained in municipal waste)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7Amendment to regulation 7 (eligible installations generating heat using solar collectors)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8Substitution of regulation 8 (eligible installations generating heat using heat pumps)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9Air source heat pumpsF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10Substitution of regulation 9 (eligible installations which are CHP systems)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

11New solid biomass CHP systemsF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12Amendment to regulation 11 (eligible installations generating heat using biogas)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13Amendment to regulation 12 (other eligibility requirements for technologies)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

14Substitution of regulation 13 (MCS certification for Microgeneration heating equipment)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

15Amendments to regulation 15 (excluded plants)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

16Metering in respect of new applications for accreditation in relation to ground source or air source heat pumpsF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

17Amendment to regulation 22 (applications for accreditation)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

18Substitution to regulation 23 (exceptions to duty to accredit)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

19Amendments to regulation 25 (producers of biomethane)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

20Amendments to regulation 26 (preliminary accreditation)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

21Preliminary registration of biomethane producersF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

22Amendments to regulation 27 (interpretation)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

23Amendments to regulation 28 (participants using solid biomass contained in municipal waste)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

24Amendment to regulation 29 (Participants using solid biomass in accredited RHI installations with an installation capacity of 1MWth or above)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

25Amendment to regulation 30 (participants using solid biomass in accredited RHI installations with an installation capacity between 45 kWth and 1 MWth)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

26Amendment to regulation 31 (biogas produced from gasification or pyrolysis)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

27Amendment to regulation 33 (biomethane producers)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

28Amendments to regulation 34 (ongoing obligations: general)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

29Substitution of regulation 37F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

30Amendment to regulation 37A (calculation of initial tariffs on or after the relevant date)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

31Amendments to regulation 37B (calculation of A)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

32Amendment to regulation 37C (calculation of B)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

33Amendment to regulation 37D (calculation of C)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

34Amendments to regulation 37E (expenditure forecast statement and tariff change notice)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

35Determination of increase in expenditure forecasts for 1st September 2014 expenditure forecast statementF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

36Amendment to regulation 39F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

37Amendment to regulation 39A (periodic support payments for new accredited RHI installations)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

38Periodic support payments for CHP systems using biomass or biogas in combination with other sources of energyF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

39Amendments to regulation 40 (fossil fuel contamination of solid biomass and fossil fuel used for permitted ancillary purposes)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

40Amendment to regulation 41 (fossil fuel contamination adjustment to periodic support payments for producers and combusters of biogas produced from gasification and pyrolysis)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

41Amendments to regulation 42 (periodic support payments to producers of biomethane)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

42Substitution of regulation 43 (treatment of additional RHI capacity)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

43Additional capacity for biomethane productionF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

44Amendments to regulation 50 (power to inspect accredited RHI installations)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

45Amendments to Schedule 1 (information required for accreditation and registration)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

46Amendments to Schedule 3 (tariffs)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

47New tariffs for plants generating heat from biomass with a capacity of 1MWth or above etcF1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

48Substitution of Schedule 4 (total expenditure)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

49Substitution of Schedule 5 (expenditure in relation to individual technologies)F1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Signature

F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Explanatory note

F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .