Article 9 Small onshore wind generating stations accredited, or additional capacity added, between 1stApril 2018 and 31stMarch 2019: grid or radar delay condition met

Original text. Later amendments are not shown.

(1)

The circumstances set out in this Article are where the electricity is—

(a)

generated using the original capacity of a small onshore wind generating station—

(i)

which was accredited during the period beginning with 1st April 2018 and ending with 31st March 2019,

(ii)

in respect of which both the approved development condition and the investment freezing condition are met, and

(iii)

in respect of which the grid or radar delay condition is met, or

(b)

generated using additional capacity of a small onshore wind generating station, where—

(i)

the station was accredited on or before 30th June 2016,

(ii)

in the Authority’s view, the additional capacity first formed part of the station during the period beginning with 1st April 2018 and ending with 31st March 2019,

(iii)

both the approved development condition and the investment freezing condition are met in respect of the additional capacity, and

(iv)

the grid or radar delay condition is met in respect of the additional capacity.