Paragraph 1 InterpretationF1
In this Schedule (including the modifications to this Order set out in paragraphs 8 to 18)—
“2018/19 obligation period” means the obligation period starting on 1st April 2018;
“capped combustion unit” means a combustion unit of a relevant fossil fuel station other than any of the following—
- (a)
an exempt combustion unit;
- (b)
a combustion unit consisting entirely of generating capacity referred to in article 45(4)(a);
- (c)
a combustion unit referred to in article 45(4)(d) or (e);
- (a)
“capped generating station” means a relevant fossil fuel station that includes at least one capped combustion unit and no exempt combustion units;
“commencement day” means the day on which the Renewables Obligation (Amendment) Order 2018 comes into force;
“exempt combustion unit” is to be construed in accordance with paragraph 2;
“mixed generating station” means a relevant fossil fuel station that includes at least one capped combustion unit and at least one exempt combustion unit;
“qualification day” means—
- (a)
in the 2018/19 obligation period, the later of 1st September 2018 and commencement day;
- (b)
in any subsequent obligation period, 1st September;
- (a)
“relevant day” means the first day of the second month after the month in which the Renewables Obligation (Amendment) Order 2018 comes into force;
“relevant electricity” means—
- (a)
electricity to which article 36 applies;
- (b)
electricity generated in any of the ways described in Schedule 5 as—
- (i)
“co-firing of regular bioliquid” (including “co-firing of regular bioliquid with CHP”);
- (ii)
“high-range co-firing” (including “high-range co-firing with CHP”);
- (iii)
“low-range co-firing” (including “low-range co-firing with CHP”);
- (iv)
“mid-range co-firing” (including “mid-range co-firing with CHP”);
- (v)
“station conversion” (including “station conversion with CHP”); or
- (vi)
“unit conversion” (including “unit conversion with CHP”);
- (i)
- (a)
“relevant fossil fuel station” has the meaning given in Schedule 5, but does not include—
- (a)
a generating station in relation to which ROCs have been issued in respect of electricity—
- (i)
generated before the date on which the generating station became a “relevant fossil fuel station” (as defined in Schedule 5); and
- (ii)
described as “dedicated biomass” (including “dedicated biomass with CHP”) in Schedule 2 to the Renewables Obligation Order 2009 or Schedule 5; or
- (i)
- (b)
a microgenerator.
- (a)
Annotations
Textual amendments
- F1
Sch. 6 inserted (20.7.2018) by The Renewables Obligation (Amendment) Order 2018 (S.I. 2018/896), arts. 1(1), 6