Paragraph 8 Article 2 modified (interpretation)F1
Article 2 has effect with the following modifications.
In paragraph (1)—
for the definition of “RO capacity” substitute—
““RO capacity”, in relation to a generating station or a combustion unit, means the generating capacity of the station or the unit other than excluded capacity;”;
for the definition of “RO input electricity” substitute—
““RO input electricity”—
- (a)
in relation to a generating station, has the meaning given in article 26;
- (b)
in relation to a combustion unit, has the meaning given in article 26A;”;
for the definition of “total installed capacity” substitute—
““total installed capacity”, in relation to a generating station, a combustion unit or generating capacity of any description, means the maximum capacity at which that generating station, combustion unit or generating capacity could be operated for a sustained period without causing damage to it (assuming the source of power used by it to generate electricity was available to it without interruption);”;
for the definition of “total output electricity” substitute—
““total output electricity”, in relation to a generating station or a combustion unit, means the total amount of electricity generated by that station or unit;”.
Annotations
Textual amendments
- F1
Sch. 6 inserted (20.7.2018) by The Renewables Obligation (Amendment) Order 2018 (S.I. 2018/896), arts. 1(1), 6