Paragraph 8 Article 2 modified (interpretation)F1

(1)

Article 2 has effect with the following modifications.

(2)

In paragraph (1)—

(a)

for the definition of “RO capacity” substitute—

  • ““RO capacity”, in relation to a generating station or a combustion unit, means the generating capacity of the station or the unit other than excluded capacity;”;

(b)

for the definition of “RO input electricity” substitute—

  • ““RO input electricity”—

    1. (a)

      in relation to a generating station, has the meaning given in article 26;

    2. (b)

      in relation to a combustion unit, has the meaning given in article 26A;”;

(c)

for the definition of “total installed capacity” substitute—

  • ““total installed capacity”, in relation to a generating station, a combustion unit or generating capacity of any description, means the maximum capacity at which that generating station, combustion unit or generating capacity could be operated for a sustained period without causing damage to it (assuming the source of power used by it to generate electricity was available to it without interruption);”;

(d)

for the definition of “total output electricity” substitute—

  • ““total output electricity”, in relation to a generating station or a combustion unit, means the total amount of electricity generated by that station or unit;”.

Annotations

Textual amendments

F1

Sch. 6 inserted (20.7.2018) by The Renewables Obligation (Amendment) Order 2018 (S.I. 2018/896), arts. 1(1), 6