Reservoirs Act 1975
1975 c. 23 · Enacted 8 May 1975 · Extends to England, Wales and Scotland
An Act to make futher provision against escapes of water from large reservoirs or from lakes or lochs artificially created or enlarged.
Annotations to the whole text
Modifications
- C1
Act: power to modify conferred by Local Government (Interim Provisions) Act 1984 (c. 53, SIF 81:1), s. 6(3)
- C2
Act modified by Channel Tunnel Act 1987 (c. 53, SIF 102), s. 6, Sch. 2 Pt. II para. 6 (with s. 45, Sch. 7 Pt. VI para. 2)
- C3
Act modified (5.11.1993) by 1993 c. 42, s. 25(2) (with s. 30(1), Sch. 2 para. 9)
- C4
Act amended (1.4.1996) by S.I. 1996/593, reg. 2, Sch. 1
- C5
Act: transfer of functions (W.) (1.7.1999) by S.I. 1999/672, art. 2, Sch. 1 (as amended (1.10.2004) by Water Act 2003 (c. 37), ss. 100(1)(6), 105(3) (with s. 100(7)); S.I. 2004/2528, art. 2(s)(i) (with Sch. paras. 7, 8) (which transitional provisions in Sch. para. 7 are revoked (1.4.2005) by S.I. 2005/968, art. 4)
Act excluded (18.7.2000) by S.I. 2000/1884, art. 38
Commencement
- I1
Act not in force at Royal Assent see s. 29(1); Act wholly in force at 1.4.1987.
Contents
- Operation of Act, and administration
- A1Large raised reservoir”: England and Wales
- 1Ambit of Act and interpretation.
- 2Registration of large raised reservoirs, and enforcement of Act, by local authorities.
- 2AConsideration of risk and provisional designation: England and Wales
- 2BDesignation
- 2CMeaning of “high-risk reservoir”
- 2DReview
- 2EAppeals
- 3Reports by local authorities to, and supervisory powers of, Secretary of State.
- 4Qualification of engineers.
- 5Power to prescribe by regulations.
- New, enlarged and restored reservoirs
- 6Construction or enlargement of reservoirs.
- 7Certificates of construction engineers.
- 8Powers of enforcement authority in event of non-compliance with requirements as to construction or enlargement of reservoirs.
- 9Re-use of abandoned reservoirs.
- Inspections
- 10Periodical inspection of large raised reservoirs.
- Monitoring and supervision
- 11Recording of water levels etc.
- 12Supervision of large raised reservoirs.
- Flooding
- 12AFlood plans: large raised reservoirs
- 12AAFlood plans: preparation
- 12BFlood plans and national security
- Discontinuance or abandonment
- 13Discontinuance of large raised reservoirs.
- 14Abandonment of large raised reservoirs.
- Additional powers of enforcement authority
- 15Reserve powers.
- 16Emergency powers.
- 17Powers of entry.
- 18Compensation to third parties for damage or disturbance.
- Supplementary
- 19Reference of disputed recommendations to referee.
- 19AAppeals
- 20General provisions as to reports, certificates etc. of engineers.
- 20AAssessment of reports and statements
- 21Duty of undertakers to furnish information.
- 21APower to require information
- 21BReports
- 22Criminal liability of undertakers and their employees.
- 22AService of notices by the Environment Agency and the NRBW
- 22CExpenses
- 22DArrangements for civil protection: charges
- Transitional and temporary provisions
- 23Continuity with previous Act.
- 24Notification to local authorities of existing reservoirs.
- 25Reservoirs in course of construction or alteration, or newly constructed or altered.
- 26Reservoirs constructed before commencement of previous Act.
- 27Large raised reservoirs not within previous Act.
- Crown application
- 27ACrown application
- 27CMinisterial responsibility
- Repeal, commencement etc.
- 28Repeal.
- 29Commencement.
- 30Short title and extent.
- Schedule 1Index of General Definitions
- Schedule 2Liability for Damage and Injury