Paragraph 1 In the County of EssexI1

England and Wales

A nationally significant infrastructure project as defined in sections 14(1)(a) and 15 of the 2008 Act—

(a)

Work No.1 – an extension to the existing generating station comprising mechanical modifications to the actuated steam turbine inlet control valves to allow steam capacity to be increased, with the effect that the extended generating station will have a gross installed generating capacity of over 50MW; and

(b)

Work No.2 – an extension to the existing generating station comprising the installation and commissioning of unrestricted actuated steam turbine inlet control valves with a capacity of over 50MW, with the effect that the extended generating station will have a gross installed generating capacity of over 50MW.

Annotations

Commencement

I1

Sch. 1 para. 1 in force at 20.12.2024, see art. 1