OpenLegislation

Paragraph 12 I1

England, Wales and Scotland

(1)

The undertaker shall, upon completion of any part of a specified work and after the purpose of any temporary works has been accomplished, remove as soon as practicable any temporary works constructed and materials for temporary works placed in, on or over the Canals in connection with that part of the specified work.

(2)

All temporary works shall be removed to the reasonable satisfaction of the engineer and in such a way as causes as little detriment or interference as reasonably practicable with, or delay or interruption to, the safe passage of vessels along the Canals.

(3)

In the event of any detriment to the Canals or interference with, or delay or interruption to, any vessels on the Canals that is caused by the undertaker’s failure to remove any such temporary works, the undertaker shall immediately make good such damage and pay to MSCC the costs and expenses to which it may be put and the compensation for any loss which it may suffer by reason of such detriment, interference, delay or interruption.

(4)

In the event of the undertaker failing to remove the temporary works within a reasonable period after receiving notice from MSCC, MSCC may remove the same and charge the undertaker with the reasonable costs and expenses reasonably incurred as a result.

Annotations

Commencement

I1

Sch. 10 para. 12 in force at 1.2.2011, see art. 1