OpenLegislation

Paragraph I1

England and Wales

In connection with and in addition to Work Nos. 1, 2, 3, 4, 5, 6, 7, 8, 9 and 10 and, to the extent that it does not otherwise form part of those Work Nos., further associated development within the Order limits including—

(a)

external lighting infrastructure, including perimeter lighting columns;

(b)

fencing, boundary treatment and other means of enclosure;

(c)

demolition of existing buildings and structures;

(d)

signage;

(e)

CCTV and other security measures;

(f)

surface and foul water drainage facilities;

(g)

potable water supply;

(h)

new telecommunications and utilities apparatus and connections;

(i)

hard and soft landscaping;

(j)

biodiversity enhancement measures and environmental mitigation measures;

(k)

works permanently to alter the position of existing telecommunications and utilities apparatus and connections;

(l)

works for the protection of buildings and land; and

(m)

site establishment and preparation works, including site clearance (including temporary fencing and vegetation removal), earthworks (including soil stripping and storage and site levelling) and excavations, the creation of temporary construction access points and the temporary alteration of the position of services and utilities apparatus and connections,

and such other buildings, structures, works or operations and modifications to, or demolition of, any existing buildings, structures or works as may be necessary or expedient for the purposes of or in connection with the construction, operation and maintenance of the works in this Schedule 1, but only within the Order limits and insofar as they are unlikely to give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.

Annotations

Commencement

I1

Sch. 1 in force at 1.5.2020, see art. 1