Paragraph I1
England and Wales
Work No. 1 — Works to construct an integrated energy park—
Work No. 1A — an energy recovery facility with a capacity to process up to 805,920 tonnes of waste per calendar year including—
fuel reception and storage facilities consisting of a tipping hall and vehicle ramp(s), shredder, solid fuel storage bunker, cranes and handling equipment;
waste processing lines, each line including a feed hopper, ram feed, air cooled moving grates, a boiler and steam systems, combustion air systems and flue gas treatment facilities including residue and reagent storage silos and tanks;
associated induced fans and emissions control monitoring systems;
up to two emission stacks;
a steam turbine incorporating at least 30 megawatts heat off–take for district heating and electrical generator (if not constructed and installed as part of Work No. 2);
an integrated protection system and uninterruptable power supplies; and
bottom ash conveyors, including storage bunker, crane and ash collection bay.
F1Work No. 1B— an anaerobic digestion system with a capacity to process up to 40,000 tonnes of waste per calendar year including—
fuel reception and storage facilities as constructed for Work No. 1A;
conveyor and feed system;
anaerobic digestor, dryers and integrated heating system;
solid digestate treatment equipment, handling and storage;
ventilation and air collection system;
emission stack;
gas flare;
combined heat and power plant, including combined heat and power engine;
an electrical switchyard, including switchgear and transformer;
gas storage and upgrading equipment; and
associated gas and process heat pipes.
Work No. 1C — solar photovoltaic panels on all or part of Work No. 1E and, should a steam turbine building be constructed as part of Work No. 2, on all or part of the steam turbine building forming part of Work No. 2, switchgear, inverters, transformers and permanent equipment for maintenance.
Work No. 1D — a battery storage facility including—
battery energy storage cells;
transformers;
protection cabinets; and
switch gear and ancillary equipment.
Work No. 1E — a building with roof enclosing and/or supporting all or part of Work Nos. 1A, 1B, 1C and 1D.
Annotations
Textual amendments
- F1
Words in Sch. 1 substituted (10.3.2021) by The Riverside Energy Park (Correction) Order 2021 (S.I. 2021/273), art. 1(2), Sch.
Commencement
- I1
Sch. 1 in force at 1.5.2020, see art. 1