Regulation 12 Compensation
(1)
Where the primary contractor has failed to carry out the qualifying repair by the last day of the maximum period the landlord shall pay to the tenant a sum of compensation calculated in accordance with paragraph (2).
(2)
The amount of compensation referred to in paragraph (1) shall be the sum of–
(a)
£15; and
(b)
£3 for every working day, if any, in the period–
(i)
commencing on the day after the last day of what would have been the maximum period if the maximum period had applied to the other listed contractor and had started on the day after the day of receipt of instruction; and
(ii)
ending with the day on which the qualifying repair is completed,
subject to a maximum amount of compensation of £100.