Regulation 13 Suspension of maximum period
(1)
The running of the maximum period shall be suspended for so long as there are circumstances of an exceptional nature, beyond the control of the landlord or the contractor who is to carry out the qualifying repair, which prevent the repair being carried out.
(2)
The landlord shall let the tenant know of the suspension of the running of the maximum period.