Schedule 1
The works referred to in this Order and shown on the deposited plan are:–
| Works No. 1 | Installation of a new intake headstock on the existing intake chamber located at Ordnance Survey National Grid Reference NG 7950 7080; provision of a new rose piece and sluice valve in that chamber; and refurbishment of that chamber and the provision of new covers. |
| Works No. 2 | Installation of a new raw water pipe from the intake chamber to Works No. 3. |
| Works No. 3 | Installation of a new meter chamber and meter to record flows, and the installation of a new swabbing chamber. |
| Works No. 4 | Installation of a new concrete channel within the existing inlet channel; demolition of the existing channel situated downstream and excavation of the loch shoreline to merge into the new channel mouth; and installation of a baffle plate at the new channel mouth and a new stainless steel catch plate. |