Schedule DEFECTS, REPAIRS OF WHICH ARE QUALIFYING REPAIRS AND MAXIMUM TIME FOR COMPLETION

Original text. Later amendments are not shown.

12
(Defect)(Maximum time in working days from date after date of notification of qualifying repair or inspection)
Blocked flue to open fire or boiler1
Blocked or leaking foul drains, soil stacks, or toilet pans where there is no other toilet in the house.1
Blocked sink, bath or basins.1

Electric power–

  • loss of electric power;

1
  • partial loss of electric power.

3
Insecure external window, door or lock.1
Leaks or flooding from water or heating pipes, tanks, cisterns.1
Loss or partial loss of gas supply.1
Loss or partial loss of space or water heating where no alternative heating is available.1
Toilet not flushing where there is no other toilet in the house.1
Unsafe power or lighting socket, or electrical fitting.1

Water supply–

  • loss of water supply;

1
  • partial loss of water supply.

3
Loose or detached bannister or hand rail.3
Unsafe timber flooring or stair treads.3
Mechanical extractor fan in internal kitchen or bathroom not working.7