OpenLegislation

Paragraph 3

(1)

In constructing the new bridge the Secretary of State shall provide headway of not less than 377 metres above the prescribed level over a clear central span of at least 415 metres.

(2)

In sub-paragraph (1) above “the prescribed level” means 68 metres above ordnance datum (Newlyn).