Paragraph 3
(1)
In constructing the new bridge the Secretary of State shall provide headway of not less than 377 metres above the prescribed level over a clear central span of at least 415 metres.
(2)
In sub-paragraph (1) above “the prescribed level” means 68 metres above ordnance datum (Newlyn).