Paragraph 2 I1
England and Wales
Wind turbine generator foundations
Wind turbine generator foundations must be of one or more of the following foundation options: piled monopile, suction bucket monopile, piled jacket, suction bucket jacket or gravity base structure.
No wind turbine generator piled monopile or suction bucket monopile foundation may—
have a pile diameter exceeding 16 metres; or
employ a hammer energy during installation exceeding 5,500 kilojoules.
No wind turbine generator gravity base structure foundation may—
have a seabed base plate exceeding 60 metres in diameter; or
have a gravel footing exceeding 62 metres in diameter.
No wind turbine generator piled jacket or suction bucket jacket foundation may—
have more than four legs;
have more than four piles;
have a pile diameter exceeding four metres; or
employ a hammer energy during installation exceeding 3,000 kilojoules.
Within Work No. 1B, the wind turbine generator foundations must not have—
a total combined seabed footprint (including scour protection) exceeding 610,726 square metres;
a total combined amount of scour protection exceeding 542,867 square metres; or
a total combined volume of scour protection exceeding 1,357,168 cubic metres.
Annotations
Commencement
- I1
Sch. 11 Pt. 2 para. 2 in force at 9.5.2024, see art. 1