Paragraph 19 ManufacturingE1
England, Wales and Scotland
The manufacturer must take all measures necessary so that the manufacturing process and its monitoring ensure conformity of the manufactured vessels with the approved type described in the F1Type examination certificate and with the requirements of these Regulations that apply to them.
Before commencing manufacture, the manufacturer must provide the F2approved body which issued the Type examination certificate with all necessary information, and in particular—
the certificates relating to the suitable qualification of the welding operations and of the welders or welding operators;
the inspection slip for the materials used in the manufacture of parts and components contributing to the strength of the vessel;
a report on the examinations and tests performed;
a document describing the manufacturing processes and all of the predetermined systematic measures taken to ensure conformity of the vessels with the type described in the Type examination certificate. That document must include—
a description of the means of manufacture and checking appropriate to the construction of the vessels;
an inspection document describing the appropriate examinations and tests to be carried out during manufacture, together with the procedures in respect thereof and the frequency with which they are to be performed;
an undertaking to carry out the examinations and tests in accordance with the inspection document and to have a hydrostatic test or, subject to the agreement of the relevant authorities, a pneumatic test carried out on each vessel manufactured at a test pressure equal to 1,5 times the design pressure;
the addresses of the places of manufacture and storage and the date on which manufacture is to commence.
The examinations and tests referred to in paragraph 19(2)(d)(iii) must be—
carried out under the responsibility of qualified staff who are independent from production personnel; and
the subject of a report.
The approved body must, before the date on which any manufacture begins, examine the documents referred to in paragraph 19(2) in order to certify their conformity with the Type examination certificate.
Annotations
Textual amendments
- F1
Word in Sch. 2 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(e) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F2
Words in Sch. 2 substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 21 para. 40(c) (with Sch. 21 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
Extent
- E1
This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only
Notes on the whole SI
Textual amendments
- F1
- F2
1972 c.68. Section 2(2) was amended by section 27(1)(a) of the Legislative and Regulatory Reform Act 2006 (c.51) and by Part 1 of the Schedule to the European Union (Amendment) Act 2008 (c.7). The enabling powers of section 2(2) were extended by virtue of the amendment of section 1(2) by section 1 of the European Economic Area Act 1993 (c.51).
- F3
Paragraph 1A of Schedule 2 was inserted by section 28 of the Legislative and Regulatory Reform Act 2006 and amended by Part 1 of the Schedule to the European Union (Amendment) Act 2008.