Paragraph 20 During construction, operation and maintenance

Original text. Later amendments are not shown.

(1)

Drill or vibro piling must be used as standard, with percussive piling only used if it is required to drive a pile to its design depth and drill or vibro piling has been unsuccessful. If percussive piling is necessary, soft-start procedures must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved.

(2)

The soft-start duration must be a period of not less than 20 minutes.

(3)

Should piling cease for a period greater than 10 minutes then the soft start procedure must be repeated.